Water utility vendor gateway rules-of-engagement checklist

Guidance for Critical Infrastructure & Utilities on water utility vendor gateway rules-of-engagement checklist: assess the real access path, supporting evidence and safe control tests.

Scope and authority for the vendor-gateway exercise

This worksheet is for a water utility with two treatment sites connected through a shared supplier remote-access gateway. The maintenance ticket covers one instrument at Site A, but the network route may also reach Site B. The purpose is to prove that a vendor can complete the assigned diagnostic task without gaining authority over an unrelated control zone. This is not a licence for vulnerability scanning of live controllers or for changing treatment parameters. The control-room supervisor must approve the test boundary and know how to stop it.

Prepare a cover sheet recording the work-order reference, test date, approved vendor identity, named source machine, authorised simulator address, excluded production networks, protocol list, expected session duration and emergency phone contacts. The utility should confirm which contractual terms allow the vendor to supply session recordings or configuration exports. If the controls engineer or plant operator cannot explain the safe fallback, postpone active testing and use passive configuration review instead.

Gate 1 — map each site separately

Obtain the current zone diagram from engineering, then compare it with actual gateway rules, jump-host routing and local account permissions. Mark both the permitted Site A destination and every adjacent route to Site B. A high-level diagram showing an “OT network” is too broad for this test. Identify which instrument simulator is reachable, which plant gateways exist behind it and whether the vendor can reach engineering file shares or historian exports without the supervised jump host.

Document any legacy devices that cannot authenticate individual users. In those cases, the gateway and local operator procedures may provide the effective boundary. Record whether a supplier credential is mapped to a site, a maintenance work order or merely an organisation-wide group. Ask who can edit that mapping, whether the change is reviewed and what happens to an active connection when the work order expires. The reviewer should be able to point to one enforcing configuration for each permitted connection.

Gate 2 — evidence preparation before any session

Collect the signed maintenance ticket, gateway policy version, identity and device posture records, session-recording status, system clock offsets and plant communications instructions. Preserve the existing access-control list so a qualified engineer can restore it if an approved test rule behaves unexpectedly. Use secure storage for screenshots and logs; they may contain detailed addresses or machine configurations that should not enter general collaboration channels.

Check how the gateway records denied access. Some devices show a connection attempt while not logging the target machine; others provide a final application audit but no network flow. Agree a combined evidence method before running the test. A later security reviewer should be able to trace the vendor identity, time, source, work order, target zone and request outcome. If those fields are missing, record the limitation in the test charter rather than fabricating precision during the final report.

Gate 3 — demonstrate the approved diagnostic

Create a test work order for a named engineer to read a non-production instrument simulator at Site A. The engineer should connect using the managed device and authorised gateway route, view synthetic status values and disconnect. Confirm that the control-room observer sees no unexpected interaction with production systems. Save the login decision, gateway destination, application result, sign-off and session termination evidence. A successful network login alone is not the outcome: the assigned diagnostic read must complete without violating the rules of engagement.

Where a real simulator is not representative, use a read-only, non-invasive configuration inspection to verify the source-to-destination policy, and clearly state which application behaviour remains untested. Do not substitute a live dosing controller simply to meet a testing checklist. The operations representative has authority to stop when plant conditions change, regardless of whether the cyber tester believes the next packet is harmless.

Gate 4 — prove the cross-site refusal

With the same authorised vendor account and its valid authentication state, attempt to select the designated test route to Site B. This negative test should be built around a simulator or approved harmless endpoint, not a live process controller. The expected result is a refusal before the forbidden zone or engineering function is reached, with a policy event attributable to the attempted destination. Check whether a direct connection through a saved remote desktop profile or an older VPN entry point bypasses the new gateway mapping.

Also test a change of work order. Close the Site A ticket, keep the old remote session alive where the platform permits a safe simulation, and confirm that access ceases according to the utility’s approved termination rule. Reconnect with a new session and verify denial again. If revocation is delayed because of a token lifetime, record the duration and whether a supervised disconnection or local firewall restriction is needed for higher-risk tasks.

Gate 5 — distinguish a legitimate multi-site specialist

An engineering supplier may genuinely support both treatment facilities. The question is whether separate site sponsors have approved the work. Create two synthetic work orders, each signed by the relevant operational authority. Verify that the second route becomes available only during its assigned window and only to the nominated test environment. A vendor’s general competence or long-standing contract should not silently substitute for local treatment-site authorisation.

Where emergency maintenance requires faster access, the water operator should maintain an out-of-band escalation to the control-room lead and engineering duty officer. Document who can approve a temporary exception, the allowed commands, recording requirements and expiry. If a local break-glass route exists for loss of the external gateway, do not expose its credentials during the remote-access test. Verify its custody and review procedure separately.

Gate 6 — stop conditions and immediate response

The test should stop if a production route is reached unexpectedly, a control device changes state, the monitored simulator behaves differently from the charter or the control-room supervisor withdraws approval. Record the exact observation, preserve the gateway and operator logs and move to the incident or engineering change procedure as appropriate. Do not continue probing to characterise a possible vulnerability on a live plant. The priority is safe plant operation followed by accurate evidence and controlled correction.

If a suspicious historical connection is found, distinguish an exposed route from actual unauthorised activity. Seek maintenance work orders, session recordings, application events and operator accounts. A vendor may have used the path for approved diagnostics before the site restriction was formalised; that can still reveal a design weakness without establishing hostile intent. Escalate evidence of changes to control set-points or unknown persistence to the qualified operational incident team immediately.

Gate 7 — implement and verify a bounded rule

The intended correction is site-scoped access through the vendor gateway with explicit destination, protocol, role and maintenance-window controls. Write a change record showing the former rules, proposed rules, approving engineer, deployment sequence, business fallback and rollback owner. Stage the rule in non-production and then use a supervised change window selected by operations. Ensure that the approved instrument read still works and that Site B remains unreachable to a Site A-only identity.

Check related services such as historian exports and engineering project storage. A supplier blocked from the Site B control subnet may still be able to retrieve configuration files through a corporate cloud share. The scope report should identify whether these information assets are included or deliberately assigned to another review. Likewise, gateway segmentation does not replace local protection of controllers that use shared passwords.

A completed acceptance register

Use the following fields for each test, and require the witness to attach actual evidence rather than write “passed” without explanation.

  • Authorised task: Site A simulator read under work order A; record application result and signed operator acknowledgement.
  • Wrong-zone request: Site B simulator route using the Site A credential; record the specific denying component.
  • Live-session expiry: access after closing the ticket; record measured effective termination and any compensating restriction.
  • Alternate entry: previously saved vendor desktop profile or legacy gateway route; record whether the same site boundary applies.
  • Emergency exception: separate site approval for a fictional urgent task; record sponsor, constrained permissions and automatic expiry.
  • Continuity: local plant operator can still perform required safe action; record the manual route and its controls.
  • Rollback: identify the authorised engineering custodian and exact prior configuration; confirm that reversal will be documented.
  • Evidence custody: store rule exports, logs, ticket approvals and test outputs with access restriction and retention owner.

Handover from cyber testing to water operations

Have the control-room supervisor and OT security lead sign distinct conclusions. One confirms that the water process was not disrupted and the required diagnostic workflow remains possible; the other confirms that the unassigned site and action are refused by a demonstrated control. Record unresolved differences between the simulator and production environment as explicit assurance limitations. If a vendor cannot provide a necessary audit detail, assign an owner to negotiate evidence access rather than invent a log result.

Schedule a regression check after supplier contract changes, gateway firmware updates and commissioning of new site connections. The utility should not have to repeat a risky live assessment to know whether a new route has been added. A narrow, reproducible test of site authority and supervised support is the lasting deliverable of this rules-of-engagement exercise.

Sources and further reading

Explore Next Defence expertise

Next Defence can help your team evaluate the permissions and operational risks in water utility vendor gateway rules-of-engagement checklist. Our specialists can review evidence such as Gateway policy, zone diagram, site work order, session audit and operator sign-off, assess whether the authorised work remains usable, and test controls against the unacceptable case where the same supplier identity reaches another treatment site’s control network. We can agree proportionate remediation with water control-room supervisor and ot security owner, backed by a repeatable acceptance test and clear incident responsibilities.

Explore OT, IoT & Critical Infrastructure Security ↗

LET'S TALK

Let’s talk about your security.

Tell us what you are protecting, where you need greater visibility or what you want to achieve. We will help identify the right next step.

Talk to a Security Specialist

Describe your security requirements. Please do not submit passwords, credentials or confidential incident evidence. This form is not an emergency incident-response channel.

Form powered by HubSpot. Review our Privacy Policy. If the form doesn’t load, email [email protected].