A water utility preparing for ransomware response may find it cannot isolate the corporate network without affecting alarms, engineering support or data historian visibility at a treatment plant. A flat instruction to ‘disconnect IT from OT’ misses the systems that need to remain available for safe local operation. This worksheet is a supervised planning and tabletop tool for qualified water operations and security personnel. It does not authorise production testing, switching live plant routes or disabling controllers.
Define the physical process before the network edge
Choose a representative fictional pumping station and describe its operational purpose, permitted operating envelope, alarm dependencies and local manual-control arrangements. Name the licensed or qualified operations authority who can approve any plant-impacting action. Identify the corporate IT owner, site automation engineer, network administrator, supplier support lead and incident commander. These roles can disagree about an isolation step; the exercise should make their responsibilities clear rather than burying the choice in a generic cyber playbook.
The first worksheet column is plant function: pumping control, safety interlock, alarm annunciation, historian capture, maintenance reporting and authorised remote support. The second column is technical dependency: controller, HMI, historian server, identity service, remote-access gateway, cellular link or supplier cloud endpoint. The third column is consequence of loss, which must be assessed by operations. Losing monthly reports is not equivalent to losing a high-level alarm required for safe treatment decisions.
Draw paths as directional relationships
For each allowed flow, record source, destination, protocol category, authentication method, network zone, data owner, approval purpose and evidence source. A line between ‘IT’ and ‘OT’ is too coarse to decide whether it can be interrupted. Mark whether the traffic is one-way telemetry, interactive engineering access, time synchronisation, patch transfer or outbound supplier status reporting. Record physical and out-of-band paths as well as logical network routes, because a contractor modem can bypass an otherwise correct firewall diagram.
Use current configurations and observed flow records where safe. An architecture document dated three years ago is a hypothesis until reconciled with current switches, firewalls and remote access. Do not discover a live industrial controller by launching an indiscriminate vulnerability scan. Qualified personnel can use approved passive telemetry, configuration inspection and vendor records to build an evidence-backed map. Where an unknown path remains, mark it unresolved with an owner instead of silently classifying it as safe.
Identify the isolation decision points
Create three hypothetical isolation boundaries: corporate user access, central monitoring connectivity and supplier remote administration. For each boundary, ask which plant functions depend on it, what automatic fallback exists and who can confirm local safe operation. The safest initial response may be to revoke a suspect supplier credential while maintaining plant historian transport. In another scenario, a compromised central management server may require a carefully approved gateway change. No security policy should assume that the same action is safe at every site.
Give each boundary a decision card: trigger, evidence threshold, operations approver, technical executor, pre-checks, expected service effect, monitoring method, stop condition and rollback authority. Include an emergency rule for when the approver is unavailable, but do not convert an unanswered call into permission to disable safety-critical communication. If the utility’s emergency operating procedure mandates local control, cite that approved operational document and who may invoke it.
Exercise an ambiguous supplier gateway alert
The tabletop begins with a synthetic detection: an approved remote support gateway establishes a session outside the expected maintenance window. The SOC sees a valid supplier identity and no known change ticket. Ask participants to request evidence of the session target, command class, source network and actual plant activity. The supplier may have received an emergency call from a technician; alternatively, an old contractor credential may have been reused. The correct early response is to validate, preserve and limit reach where justified, not claim controller compromise from a connection record.
Next reveal that the corporate identity service is unavailable. The operations team must assess whether local plant monitoring and control continue independently. Record which remote support actions cannot be authorised, whether the local engineer has a safe alternative, and how a restricted incident channel will communicate decisions. A plan that requires cloud identity to recover the cloud identity itself needs a verified break-glass dependency. Test that decision in a simulated environment or review it against a provider-supported method; do not improvise a live emergency account.
Insert a partial network separation
The facilitator announces that an IT segment is isolated in a tabletop model, but one plant historian feed stops updating. Participants must determine whether only reporting has failed or whether essential alarm visibility is affected. Ask the control engineer for the process evidence before changing another route. The incident commander should record the time at which operations accepted or rejected the proposed change and the reason. This is more valuable than giving every team a fictitious perfect network diagram from the start.
Introduce a second path: a separately maintained vendor cellular modem remains connected. Determine whether it creates a route into engineering assets that would defeat the intended isolation. Record the owner, support contract, credential custody and feasible restriction. The test is not to attack or scan the modem. It is to show that the utility knows the alternate path exists, can decide whether it is authorised, and has a supervised process for restricting it without losing required maintenance capability.
Table of required evidence and sign-offs
The worksheet should contain one line per critical path with a unique reference, last verified date, operational dependency, current owner and isolation proposal. Attach configuration snapshots or passive-flow references in an approved repository; do not paste plant credentials into the workbook. For each proposed change, require an operations safety acceptance, cyber risk judgement and technical rollback check. A signed IT firewall ticket alone is insufficient where the action could alter treatment processes.
Score the result as mapped and observed, mapped but not verified, unknown or prohibited, rather than a single percentage called segmentation maturity. For a prohibited path, specify what evidence shows traffic was denied. For an unknown path, identify the qualified person and maintenance window needed to resolve it. If a vendor refuses to disclose a connectivity requirement, flag it as a procurement and safety assurance issue.
Validate without touching live control logic
Use a laboratory network with representative gateways and synthetic historian messages, or a vendor-approved digital model. Test that approved status telemetry continues when the hypothetical corporate link is removed; verify that the unapproved maintenance path is refused. Observe alarms and job states in the model. Never present a successful lab outcome as proof that an untested production station will behave identically. Environmental differences, firmware versions and physical fail-safe mechanisms need separate operational acceptance.
Run both positive and negative cases. The local engineer should retain approved emergency visibility in the model; an unauthorised supplier role must be denied an engineering session. A test that simply powers down all simulated communications demonstrates an outage, not selective protection. Record configuration versions, test observers, expected messages, received messages and deviations for retest.
Plan return to service as a separate decision
When the fictional threat is contained, restoring the corporate link should require confidence that the suspect credential and route are no longer active, that relevant network configurations match approved versions, and that operations can observe process stability. Reconnection may need staged approval so backlogged messages do not overwhelm a fragile gateway. Assign who checks plant alarms, who validates historian completeness and who confirms that remote support is re-enabled only for named accounts and purposes.
The recovery record should describe what remained locally operational, which data was delayed or lost, how any reporting gap was reconciled and what exception persists. A successful corporate-network ping is not the same as safe water-service recovery. If the plant is running under a modified mode, the authority for that mode belongs to qualified operations personnel, not the SOC.
Worksheet entry for a dual-purpose gateway
Example map entry: Gateway G1 carries alarm-status messages from the station historian to the central operator room and also permits scheduled supplier diagnostics through a separately authenticated service. Mark the alarm path as operationally important and the supplier path as conditionally permitted. Do not label the entire gateway ‘non-critical’ because the contractor link is optional. In the tabletop, the proposed response restricts the supplier identity without disabling historian forwarding. The control engineer verifies expected alarm visibility in the model, the network owner records the policy version, and the incident commander accepts the residual uncertainty. A separate unknown cellular path remains open in the worksheet until proven otherwise.
Close the workshop with an actionable map
The final product is a current dependency map with named owners, an approved set of candidate isolation decisions and an evidence-backed list of unknowns. Require a retest after new sensor firmware, supplier remote-access changes, identity-platform migrations or major plant upgrades. The result should let the incident commander understand the next safe question without pretending to operate the water process. A defensible water utility response protects the service and the people relying on it while reducing an attacker’s network reach through measured, authorised actions.
Sources and further reading
Explore Next Defence expertise
Next Defence can help your team evaluate the permissions and operational risks in water utility resilience dependencies and isolation map worksheet. Our specialists can review evidence such as Data-flow map, critical asset list, gateway policy, local manual procedure and restore log, assess whether the authorised work remains usable, and test controls against the unacceptable case where a blunt cut disables vital alarm telemetry or leaves a supplier backdoor into the plant. We can agree proportionate remediation with water operations executive and ot systems engineer, backed by a repeatable acceptance test and clear incident responsibilities.