Exercise objective, safety and participants
This 90-minute exercise tests how an Australian mine operator would investigate a stolen or impersonated supplier identity without interrupting safety-critical production. Use fabricated accounts and records only; do not send test commands to live controllers, remote maintenance gateways or production networks. Invite the mine control-room representative, OT engineering authority, identity administrator, security analyst, supplier manager, incident commander, communications lead and an observer. State the decisions to test: which evidence proves a session is suspicious, who can revoke supplier access, what operating function must continue and how the response team can demonstrate that the unwanted route is closed. The facilitator should pause the scenario whenever a participant proposes a technical change without the required engineering and safety approval.
Environment and starting conditions
The fictional organisation, Ridgeview Minerals, operates two sites connected to a cloud identity platform and a remote maintenance service. A contractor account is intended to reach a diagnostic server for a water-handling subsystem at Site A during an approved window. The account must not administer Site B or make changes to the production control network. The supplier's normal engineer is on leave, and an approved stand-in is scheduled for a routine diagnostic session. Provide participants with a simplified route diagram, supplier agreement, identity audit excerpt, approved work order and gateway session log. Clearly mark data as synthetic. Define that the mine can continue safe operations while the diagnostic connection is unavailable, but an urgent equipment alarm may require supervised engineering support.
Inject 1 — an identity that appears legitimate
At minute 10, the SOC reports a successful supplier sign-in from an unfamiliar source followed by a request to reach the maintenance gateway. The supplier manager sees no approved call-out for that time. Ask participants what they know and what they need to verify. A new IP address is not conclusive; the vendor may be working through a permitted alternate network. Check the identity owner, work order, authenticator enrolment, device or client information and whether a gateway session was actually established. Record competing explanations. Require an incident classification that reflects evidence rather than alarm severity. The control-room operator should be informed of any credible operational impact without receiving sensitive account details that are irrelevant to plant safety.
Inject 2 — impersonation meets remote support
At minute 25, the supplier helpdesk receives a call from someone claiming to be the engineer and demanding a one-time access exception. The caller supplies an urgent equipment story and a new phone number. The participant acting as supplier manager should use the established contact record, not the number supplied by the caller. Security must determine whether the requested exception would enable a new session, additional host access or credential recovery. If the caller is unverified, no privilege should be granted. The incident commander should identify the authorised path for a genuine emergency, including a verified engineer and engineering approval. Observe whether the team can resist the pressure to bypass established controls while still offering a workable response to an actual equipment problem.
Inject 3 — an attempted route outside scope
At minute 40, a sample gateway record shows the session attempted to reach a Site B management address, which the contractor's approved work order does not cover. The request may have been denied, timed out or completed; provide a separate application event that participants must consult to establish the result. Ask the analyst to distinguish attempted lateral movement from confirmed access. The engineering authority should identify the consequence of a broad gateway shutdown and any safer narrow restriction. The identity administrator should propose revoking the affected session and checking other grants, while the supplier manager contacts the provider through its documented emergency path. The exercise rewards an evidence-led decision, not the most dramatic containment step.
Inject 4 — the credential may persist elsewhere
At minute 55, the analyst discovers that the supplier account also holds an application consent for an engineering document service. Participants must assess whether revoking the VPN or gateway session closes every meaningful path. Ask who can inspect and remove the delegated consent, whether the account is shared and whether related service credentials have been exposed. Do not assume that resetting the user's password invalidates all tokens in every application. Preserve the relevant identity and application records, then use the synthetic environment to verify denial of the old session and unauthorised document request. The business owner should provide a clean authorised alternative for any essential maintenance work that remains outstanding.
Containment decision and safety review
The incident commander now needs a documented choice. Options include restricting one contractor identity, disabling its gateway policy, pausing the vendor connection or temporarily isolating a management segment. For each, record the expected risk reduction, operational consequence, technical owner and required approval. The safest action may be targeted identity revocation if the evidence identifies a single compromised account; broader restriction might be justified if the gateway itself is no longer trustworthy. Engineering and safety representatives must approve changes that could affect essential plant functions. Define what would trigger further escalation. No participant should imply that a control-room process can be disconnected casually on the basis of a simulated alert.
Communicate a verified operational status
At minute 70, the production manager asks whether the site is under attack and whether the next shift can continue. The incident commander should state known facts: an unexplained supplier sign-in, an out-of-scope connection attempt, containment steps taken and which systems remain verified operational. Distinguish that from unconfirmed data access or equipment manipulation. Provide staff with one trusted route for reporting abnormal maintenance activity. Suppliers may need a narrowly scoped operational instruction without receiving internal investigative detail. The communications lead should record who approved messages and which facts they rely on. A later change of assessment should update the record openly rather than pretending the initial hypothesis was certain.
Recovery and positive/negative acceptance tests
Use two fabricated identities: the revoked supplier and a new authorised maintenance engineer. After containment, the old identity should fail to access both the gateway and the document service. The authorised engineer should be able to complete a permitted diagnostic request through the agreed path, leaving a traceable session record. Confirm the control-room representative can continue the safe local operating process and that monitoring receives identity and gateway events. Check whether any configuration or data change requires reconciliation. Do not declare recovery solely because the main connection works; the exercise must show that the unwanted route is denied and business functions remain available. Preserve an evidence sheet with event IDs, test owner and actual result.
Debrief, owners and retest schedule
Use the final ten minutes to identify where the response depended on unavailable supplier contacts, incomplete logs, unclear permission boundaries or an untested restoration procedure. Assign each issue an operational and technical owner, an interim restriction, a completion date and a repeatable acceptance test. Record whether the team distinguished suspicious behaviour from confirmed compromise and whether it obtained approval before any plant-impacting decision. Avoid a single pass/fail label hiding missing evidence. Re-run the most difficult inject with another shift and an alternative vendor contact. Leadership should receive the specific risk reduced, the remaining uncertainty and the tested ability to maintain essential operations through a credible credential-impersonation incident.
Facilitator scoring guidance
Score the exercise in separate dimensions rather than assigning a single dramatic incident grade. For detection, ask whether the team reconstructed the actual gateway request and differentiated it from the sign-in alert. For authority, check whether any proposed containment action had the correct engineering and incident approvals. For continuity, observe whether essential local plant functions remained available and a verified maintenance fallback was identified. For identity, require proof that the old supplier session and any relevant delegated grant were denied after containment. For communication, examine whether leadership received known facts, uncertainty and the next decision time. Mark each dimension demonstrated, partially demonstrated or not demonstrated, with an evidence reference. A persuasive discussion without a repeatable test is useful preparation but should not be scored as verified technical control effectiveness.
Alternative branch when the vendor cannot be reached
Repeat the second inject with the supplier's primary incident contact unavailable. Ask who can impose a narrow restriction locally, whether the mine has its own gateway administrative authority and what contractual emergency escalation route exists. An unresponsive vendor should not force operations to keep a suspicious identity active forever, but any change that could affect site safety still needs the authorised plant decision. If remote maintenance is essential, the mine may arrange a supervised verified alternate technician after appropriate checks. Record which approvals can be made on site and which depend on the vendor. The objective is to expose a real dependency before an incident, then improve contact information, identity ownership or secure fallback procedures. The simulation should remain entirely non-disruptive to live operational systems.
Evidence and action pack for the next shift
Provide the incoming shift with a concise incident summary identifying affected identities, permitted and restricted routes, the current operational status and the specific indicators that would trigger further action. Store source log identifiers and contact decisions in an approved case system with access controls. Do not circulate passwords or copied session tokens. Include a list of unfinished configuration checks, a person responsible for each and the verification required before a suspended connection returns. After the exercise, have a second team member use the pack to explain why the current restrictions are appropriate. If the handover depends on knowledge held by one participant, the process is not mature enough. Repeat the most difficult decision with another shift and verify that the same safe result can be obtained.
Follow-up exercise and evidence review
Within the agreed review period, repeat the gateway restriction and session-revocation tests with a different support team. Verify that the alternate vendor contact works and the mine can still complete its supervised maintenance activity. Check that the new shift receives the right current restriction and does not re-enable an account that remains suspect. Record every action with the relevant site authority and technical evidence. The programme improves when the result is consistent across different staff and shifts, rather than dependent on the original exercise participants' memory.
A maintenance identity can be genuine but used outside its mandate
Give exercise participants a stolen vendor identity that signs into the right support platform but requests a historian export beyond its service ticket. Ask the OT lead to verify the target, time window, authorising engineer and intended maintenance outcome, rather than accepting successful MFA as proof of legitimacy. Use fabricated telemetry and an isolated training environment; never run an intrusive test against a live mine controller.
At the shift change, the incoming supervisor receives a valid but stale vendor work order. The team must decide whether to retain a restricted read-only route for operations or terminate access entirely. The debrief should compare the approved task, session record and actual data reached, and identify who is accountable if the supplier's incident contact cannot be reached.
Sources and further reading
- ASD and partners, Principles of operational technology cyber security
- ASD, Essential Eight maturity model (November 2023)
- NIST, Cybersecurity Framework 2.0
Strengthen your security with Next Defence
Next Defence helps mining and resource operators exercise supplier identity incidents, validate safe containment and improve OT-aware cyber resilience.