What Utility Leaders Should Ask About Edge Devices Before Approving a Refresh

Use ASD's February 2025 guidance to set defensible architecture priorities for utility edge devices, supplier access and service continuity.

A utility needs to replace an ageing edge appliance but cannot interrupt the field service it supports. The vendor proposes an updated device. The CISO wants better monitoring and narrower administrative access, while operations needs a supported fallback. Those requirements belong in the same architecture decision. ASD’s February 2025 edge device guidance and Foundations for modern defensible architecture give leaders a basis for discussing what the edge must do, which risks to address first and what evidence will show a better result.

Separate the February publications from the local decision

ASD’s practitioner and executive edge device publications carry a 4 February 2025 date. Its news item describing the joint guidance is dated 5 February. Foundations for modern defensible architecture was published on 10 February. The edge device guidance addresses internet-facing network hardware and appliances, including routers, firewalls and VPNs. The architecture publication addresses broader resilience and defence through an approach that spans systems and services. None of those publications can identify which device in a particular utility is unsupported, exposed or relied on for essential work. Use the publications to ask questions the organisation can answer with its own evidence.

Start with a service map rather than an appliance count. Identify which services depend on each boundary device, which routes can reach administration and what role the device plays in the service’s continuity plan. Include managed devices and alternate paths used during maintenance or recovery. Ask the site owner what work can continue if the device is unavailable and what information the duty team must retain. An internet-facing device with limited downstream authority may warrant a different response from an apparently similar device serving several operational locations.

Decide which risks justify replacement or redesign first

Record the model, version, support status, owner, management access and last verified date. Ask which devices can receive relevant updates and which have vendor limitations that affect security or visibility. Distinguish a supported device awaiting a planned change from one without a reliable support path. Identify the effect of a compromise or failure and the resources that could be reached from the device. Give unknowns a named owner and review time instead of assuming the asset’s presence in an inventory establishes its state.

Use operating consequence to choose the first investment. Replacing an unsupported device may remove a recurring exposure. Separating administration from ordinary traffic may reduce the consequences of an access issue. Improving independent evidence may help a duty team confirm what happened when a provider changes the appliance. These choices can be combined, but each should have its own acceptance check. Ask which one addresses the most significant gap in the service and what work can continue while the change is delivered.

Review who can manage the device and from where

Identify the actual administration path, including supplier support, cloud-managed functions and emergency access. Ask who can grant or remove authority, how changes are approved and which records the utility can obtain independently. Confirm the management boundary with approved configuration evidence and a representative authorised test. A provider may manage a device for the utility, while a separate platform or network owner controls the route used to reach it. Give both parties a responsibility and an observable result.

Review temporary and alternate access. A supplier might need a limited support window during a fault, and a site may need an approved route when central communications are unavailable. Define which permissions apply, who approves them and how their end is verified. Test a representative case using fictional records and an agreed environment. The utility should be able to confirm which support work can proceed and what evidence shows that an unrelated account or location cannot use the same route.

Design for useful evidence when the edge is degraded

Specify which events would change an operating or security decision. These may include a management change, an unexpected supplier session or a loss of telemetry from an important device. Ask where records are held, who can access them and how the team identifies a collection delay. Have a provider and utility owner demonstrate one approved event and match it to the service record. Keep an evidence route independent of the affected device where possible. Identify which questions still require another source.

Use a synthetic scenario where central monitoring loses visibility but the field service continues. Have the duty team identify the last verified state, reach an approved contact and decide whether a local fallback is needed. Record how site and central evidence will be reconciled after the link returns. Ask the next shift to identify the current operating instruction and outstanding review. The exercise should make clear which evidence the architecture can provide in the conditions that matter most.

Verify the change and the recovery path together

Give each proposed change a target state, a test and a stop condition. Check the intended version, access boundary and representative service outcome. Have an authorised operating owner confirm that the field or customer workflow remains available. Test a fallback or rollback in an approved environment. Ask whether an earlier configuration would restore an insecure management route or unsupported version. If it would, agree an approved alternative or a limited temporary arrangement with a responsible owner.

Include supplier dependencies in acceptance. Ask the provider which artefact or configuration it deployed and what evidence the utility can retain. Verify that obsolete support access is withdrawn and that the next duty team can reach the correct contact. Ask a separate reviewer to confirm the state after the next ordinary maintenance activity. That makes it possible to distinguish a one-time correction from an architecture change that remains in effect.

Give the board a decision and a measurable result

Report the priority services, boundary dependencies and verified exposures. Identify which choices need approval or investment and what the operating owners expect to observe after the change. Useful measures include the share of essential services with verified boundary ownership, the number of unsupported devices on consequential routes and the time to confirm a management restriction. Keep unknown or untested paths visible. A measure should show which service and operating condition it represents.

Ask leaders to approve a review date and a representative retest. Choose a device or supplier change that could affect the assumptions behind the first result. Have an incoming duty owner explain what it can observe, who can authorise a restriction and which fallback remains available. The February 2025 publications give the utility a basis for asking those questions. Its own acceptance records should show whether the resulting architecture protects the service in practice.

Compare a proposed replacement with a change to the boundary

Ask the design team to compare two options for the same service. One may replace an appliance while preserving the current management route. Another may also separate administration and give the utility a way to observe provider activity independently. Require both options to demonstrate the operating fallback and record the effort each demands from the site. If the broader design cannot be delivered in the first maintenance window, give the interim state a named owner, expiry and retest. This helps leadership make a staged decision without losing track of the risk that remains after the appliance is replaced.

Compare the new edge appliance against its operating fallback

Place the proposed edge device in a segregated lab that reproduces the utility’s relevant field-facing route, without sending commands to production systems. Ask the vendor to demonstrate configuration ownership, signed update provenance, management access restrictions and the logs available when the upstream network disappears. Provide a controlled failure in which the new appliance stops passing telemetry but the old communications path remains physically available. Operations must decide whether to hold the change, switch to an authorised fallback or accept a documented gap; security personnel cannot make that safety decision alone. Repeat the case with the vendor support account expired and confirm that field data still reaches the approved receiver while remote maintenance is blocked. The evidence pack should show appliance model and support date, approved interface map, management-plane account list, observed failover duration, alarms and the owner of any temporary route. Present a comparison of the refreshed device and an option that also changes the administrative boundary. Funding approval should follow the tested service outcome, not a manufacturer feature list.

Sources and further reading

Strengthen your security with Next Defence

Next Defence can help critical infrastructure operators turn edge device risks into architecture decisions with verified controls, ownership and recovery evidence.

Explore Security Architecture, Advisory & Transformation ↗

LET'S TALK

Let’s talk about your security.

Tell us what you are protecting, where you need greater visibility or what you want to achieve. We will help identify the right next step.

Talk to a Security Specialist

Describe your security requirements. Please do not submit passwords, credentials or confidential incident evidence. This form is not an emergency incident-response channel.

Form powered by HubSpot. Review our Privacy Policy. If the form doesn’t load, email [email protected].