A manufacturer receives proposals for managed protection across office devices, engineering workstations and cloud services. The providers describe different levels of coverage and support. The plant manager wants to know whether approved engineering work will continue when a control acts and who can verify a change during a maintenance window. Use this scorecard to compare the proposals on the same service conditions. The result should identify what each provider can demonstrate, which operating decisions remain with the manufacturer and what needs to be verified before rollout.
Define a representative workflow and its boundaries
Choose a workflow that depends on more than one technology owner. For example, a technician uses an approved engineering application, retrieves a controlled document and asks a supplier to verify an update before planned maintenance. Record the equipment and services involved, the approved people and roles, and the business effect of an interruption. Distinguish office devices from engineering or operational environments. NIST's OT security guidance makes reliability, performance and safety important design considerations. Use those conditions to define where and how a demonstration can occur.
Use a representative test environment, approved identities and fictional work records. Identify the ordinary task, a restricted case and an unavailable contact or provider source. Give each candidate the same scenario, decision window and evidence requirements. Ask who can approve any exercise change and what conditions require it to stop. Do not test a new control on live production equipment to obtain a procurement score. Give the plant owner and the technical reviewer separate responsibilities for observing the result.
Set the weights and evidence rules
Use six criteria. Give 25 points to control coverage and verification, 20 to production impact and continuity, 15 to operating effort, 15 to provider boundaries and authority, 15 to incident handling, and 10 to audit evidence. Score each criterion from zero to four. Zero means absent or unsupported. One means described but not demonstrated. Two means partly demonstrated. Three means demonstrated for the representative workflow. Four means demonstrated with a relevant exception, failure or handover. Multiply each rating by its weight and divide by four, then add the results. Ratings of three, four, two, three, two and three produce 72.5 points.
Set mandatory conditions before comparing totals. A plant may require written approval for changes affecting equipment, a tested stop route and a usable fallback for essential work. A provider should be able to identify its scope and protect the evidence it handles. Record the reason and evidence behind each score and have the operating owner confirm the conditions. A total should not hide a failed mandatory condition. Give any conditional acceptance a named owner, expiry and a repeatable test.
Score control coverage and verification
Ask the provider to map which controls apply to each in-scope device, identity and service. Identify what it can deploy, what it can observe and what belongs to a separate application or supplier. Ask how it identifies a device outside management or a protection source that has stopped reporting. A coverage percentage is useful only if the manufacturer can see which assets, environments and operating conditions it describes. Request customer-specific evidence from a representative set of roles.
Use an authorised synthetic task to confirm the intended result. Have a test role perform an approved action, then verify that another action outside its scope is restricted. Ask the provider and manufacturer to show which system enforced the boundary. Include a device or workload that has another management arrangement. Record what is demonstrated, what relies on documentation and what remains outside the scope. ASD's Essential Eight provides a useful reference for measures such as application control, patching and administrative privilege restriction where those measures apply.
Score production impact and continuity
Give the provider a case in which the new control blocks a legitimate engineering or maintenance task. Ask it to identify the affected service, the decision owner and the approved fallback. Have the plant owner demonstrate which work can continue and set the point at which the change must stop or be reviewed. Confirm that any temporary access is narrow and expires. A candidate that can identify a restriction but cannot explain how the site will maintain approved work needs a separate operating check.
Ask how the service will be piloted and recovered if a change fails. Check that an earlier configuration cannot reintroduce an unsuitable privilege without review. Ask a different shift to locate the approved procedure and verify one ordinary task. Record the operating conditions and timing. A successful test at a daytime site may not establish that a disconnected facility or night shift can obtain the same support. Give those differences their own observations when they affect the proposed service.
Score the effort and provider boundaries
Ask each candidate to map responsibility for policy, deployment, exception approval, monitoring and maintenance. Identify what the provider will do and what the manufacturer must staff or verify. Record the systems, information and support routes needed for each. ASD's managed service provider guidance can help structure discussion of access and shared responsibilities. Use a synthetic onboarding or role change to observe how both parties make and verify a change. Include the work required from site staff.
Review ongoing effort, including updates to service ownership, exception reviews and recovery exercises. Ask whether the site needs local specialist coverage when the provider acts. Give the candidate an unavailable contact and ask how it would reach a verified alternate. Confirm who can approve a production-affecting change and how the approval is recorded. Score the work actually demonstrated and identify any new staff or process requirement the proposal creates. A more automated service can still depend on local authority and usable operating evidence.
Score incident handling and audit evidence
Give each candidate the same fictional alert about an unexpected provider session or a protected device that stopped reporting. Ask what it can establish, who will make the decision and which observations will verify a restriction. Include one service that depends on a separate supplier. Have the candidate state what it would tell the duty owner and how it would report an unresolved question. Verify whether the manufacturer can see the result independently. Capture the time to reach a named owner and the time to verify the action.
Request a sample audit record using synthetic information. It should link the service, approved role or change, observation, decision and result. Ask who retains the evidence, how the manufacturer can retrieve it and what happens after a provider change. Test whether an authorised reviewer can understand the record without the original operator. The joint ASD and partner event logging guidance can inform evidence questions about collection, correlation and retention. The score should reflect whether the records are useful for the actual plant decision, not how many events the platform advertises.
Turn scores into procurement and rollout conditions
Present the scores with the operating consequence and evidence for each. Give each gap a named owner and a test. A supplier may need to demonstrate a customer-specific restriction, the manufacturer may need an after-hours approver, or the plant may need an independently verified fallback. Include the relevant commitment in the service decision or statement of work. If a feature requires a later check, state what has already been established and what still needs an acceptance decision. Avoid granting full credit for planned capability.
At the first pilot review, repeat the criterion most likely to change the operating decision. Use another authorised role, shift or site if the service arrangements differ. Confirm that accepted work still proceeds and temporary exceptions end. Compare the actual customer effort with the proposal. Retain the scores, evidence and review time so an incoming service owner can repeat the assessment after a material change. The value of the scorecard is an evidenced decision about protection the plant can use and verify.
Give the selection panel one example to compare before scoring real proposals. A provider may offer comprehensive corporate coverage while relying on the plant for engineering access decisions. Another may demonstrate an engineering restriction but have limited after-hours evidence. Ask which gap matters most to the chosen service and what would close it. Record the reason beside the score. This keeps comparison tied to operating authority and verified results rather than feature counts.
Compare two results before committing
Use a fictional pair of results to calibrate reviewers. Suppose one provider can show current protection across office and engineering assets but needs the manufacturer to verify emergency access at the site. A second can demonstrate the maintenance fallback and approval chain but cannot verify the status of a supplier-managed workstation. Score the evidence and ownership gaps separately. A provider's wider estate coverage may be valuable while a gap on an essential support path deserves its own condition. Ask which service each gap affects and what the customer would need to do to close it.
Test a condition tied to procurement rather than a technical feature alone. Ask the preferred provider to deliver a customer-specific list of covered assets, responsibilities, authorised response actions and evidence sources for the pilot. Have the plant owner use the list in a fictional support case. Verify that the person on shift can identify what protection applies, who may act and what the provider must confirm. If the answer depends on another supplier, assign a named liaison and a test date. Give the manufacturer a copy it can retain independently of the provider portal.
Use the result at the first service review. Compare actual site effort with the commitment and check that an unresolved responsibility did not become a standing exception. Choose one action to retest after a production or supplier change. An observed improvement should raise the relevant score. A plan or service description can support a decision to investigate further without being scored as an outcome the manufacturer can already rely on.
Score containment where an engineering station crosses networks
A provider's proposal may show strong endpoint coverage on office computers but omit the engineering laptop used to change production recipes. Use an approved test account and a staged workstation to ask how its detections reach the SOC, who may authorise isolation and whether the line supervisor can see the operational effect. Do not isolate a live controller or stop a manufacturing process for a procurement demonstration.
Award separate points for telemetry coverage, safe containment authority and the ability to reconstruct a session after the event. If the supplier relies on a subcontractor for the site gateway, name the dependency and the evidence delivery time. A high score requires the plant to understand the exception that remains when the provider's standard corporate response playbook cannot be used in OT.
Sources and further reading
- NIST SP 800-82 Rev. 3, Guide to Operational Technology Security
- ASD Essential Eight Maturity Model
- ASD guidance on managing security when engaging a managed service provider
- ASD and international partners, Best Practices for Event Logging and Threat Detection
Strengthen your security with Next Defence
Next Defence can help manufacturers evaluate managed protection proposals with representative plant workflows and measurable acceptance tests.