A mining group may use one remote support jump host to serve geographically separated sites. The arrangement saves administration effort, but a vendor technician approved to inspect a historian at Mine A might discover that the same session can reach a controller-management interface at Mine B. Remote connectivity and authority to perform an engineering task are different things. A safe model should attach access to the work order, site, equipment and approved operation rather than to a broad supplier identity.
Start with the work order and local supervisor
An external technician may legitimately need to review fault history, observe a historian feed or collect equipment diagnostics during planned maintenance. The work order should identify the site, asset group, named engineer, requested function, approval window and local operations sponsor. Do not treat ‘vendor is approved’ as a permanent company-wide entitlement. Maintenance conditions can differ between locations; one mine may have different safety procedures, network segmentation or plant availability requirements from another.
Local supervisors must be involved in decisions that could change industrial operating conditions. A cyber team can restrict identity and network paths but should not independently operate controllers, change plant settings or run active scans against industrial equipment. In a security review, document the safe diagnostic method agreed with qualified operators. If the vendor’s tools cannot reliably separate read access from write capability, record that limitation and require additional human and technical safeguards.
A shared jump host can conceal multiple credentials
Trace how an engineer reaches the destination: identity provider, VPN or zero-trust gateway, jump host, local desktop session, engineering software and target historian or controller. Each link may use different credentials and logging. A technician can appear to have a narrow cloud role while the shared jump host has stored administrator credentials to multiple sites. Identify where authorisation is actually enforced for the target operation. Restricting a web portal will not help if an alternate remote desktop client or vendor cellular link reaches the same equipment.
Inventory all site routes with the network owner, including historic maintenance tunnels and emergency dial-in arrangements. Avoid inferring segmentation solely from network diagrams last updated during commissioning. Compare documented paths with current firewall, jump-host and vendor support configurations using approved passive evidence. If a path’s owner is unknown, treat it as an exception requiring investigation rather than silently assigning it to general IT support.
Separate historian observation from controller change
A historian typically supports data review, while controller configuration can alter physical operation. Even when both services appear on one engineering workstation, they should not share unrestricted operator authority by default. Define which commands and datasets are necessary for the scheduled diagnosis. For example, an approved engineer might read a fabricated trend from Mine A; the same session should be unable to write to a simulated controller in Mine B. The destination’s access decision matters more than the success of a network connection.
Where equipment or vendor tools offer no fine-grained authorisation, consider controlled jump sessions with local supervision, recorded approval and a technically restricted route to only the required equipment. The risk should be documented, with a compensating method and a plan to improve the design. Merely labelling a session ‘read only’ in a ticket does not guarantee that the underlying engineering software cannot issue commands.
Make sessions expire when the job ends
A maintenance grant should be short-lived and tied to a named work order. Check what happens after the scheduled end, after a supervisor changes shift and after the vendor technician leaves the engagement. The gateway may deny new sign-ins while an established desktop session remains active. The platform should provide a way to terminate existing access and confirm its closure. Persistent vendor accounts and shared local machine passwords make offboarding hard to prove; insist on individual attribution wherever technically feasible.
When maintenance spans shifts, the receiving operations supervisor should explicitly accept the remaining scope and duration. Do not rely on a standing exception granted by someone who has left site. Establish a contingency for emergency repairs so that security restrictions do not force operators to create an undocumented backdoor. An emergency route should still identify its sponsor, intended target and subsequent review owner.
Distinguish connection evidence from equipment evidence
Gateway logs may tell investigators that a technician connected to the jump host, but not which controller function was used. Collect session identifiers, assigned roles, host access events, engineering application audit and device change records where available. A successful remote session does not prove a harmful command, and an apparent denied connection does not establish that all alternate routes were blocked. Correlate observations with the maintenance work order and operations log before describing intent or impact.
If a session reaches an unexpected destination, ask whether the technician was redirected for legitimate support or whether the credential had unintended scope. Either possibility may justify narrowing the route, but the incident classification and operational response differ. Preserve the relevant evidence before changing the configuration, and avoid collecting sensitive plant drawings into an ordinary collaboration channel. Engineering owners should identify the minimum technical record needed to determine whether equipment state changed.
Exercise two simulated mine sites
Create a lab with separate site zones, a shared support gateway, one historian simulator and a non-production controller analogue. Approve a test technician for read-only monitoring at Mine A. Verify that the permitted trend view works and the event attributes it to the named identity and work order. Then attempt a connection to the Mine B controller analogue, including a route through any shared jump host. The expected outcome is refusal at the relevant gateway or destination and an auditable record that explains the site boundary.
Next, let the work-order window expire and attempt to reuse an existing session. Confirm the actual path terminates, not only that the ticket status changes. Test the approved emergency path with a separate fictitious supervisor and a short authorisation. Neither scenario requires live controller access. If any testing must occur on production networks, obtain an explicit change and safety assessment from qualified site personnel rather than assuming a cyber exercise is harmless.
Design the fallback before an incident
A remote vendor may be unavailable when a site encounters a genuine fault. Define an on-site diagnostic fallback, trusted vendor contact method and safe degraded operating mode with local engineering. For high-risk changes, the plant operator should retain authority over physical state. During suspected credential misuse, security can revoke a specific session or site grant while leaving unaffected approved monitoring operational if the architecture supports that separation. Broad disconnection may be necessary in some incidents, but its production consequences must be deliberate and documented.
Check how changes or queued commands are reconciled after remote access is restored. A controller configuration or historian feed should be validated against a trusted engineering baseline by someone accountable for the asset. The fact that the vendor reports a successful repair does not replace the site’s own verification, especially where a session crossed site boundaries or another engineer took over the work.
Put the scope in the vendor agreement
Support terms should require individually attributable engineer access, site-limited entitlements, work-order linkage, session evidence, prompt termination on request and a defined emergency escalation route. Ask whether the provider uses subcontractors or shared support teams that might inherit all customer credentials. Ensure the mine can retrieve meaningful access logs when an incident occurs, rather than depending on a provider’s unverified summary. Audit these commitments after changing support platforms, not only when a contract renews.
A periodic review should compare approved maintenance routes with the actual gateway configuration. Retire unused site grants and verify that credential or policy changes remove old sessions as intended. If a shared jump host remains necessary, require explicit design decisions about access to each site’s equipment and the visibility of cross-site attempts.
Acceptance must be site specific
Management should see a short result: the named technician completed the authorised simulated historian read at Mine A, the same session could not reach the Mine B controller, the old session expired after the work order, and local operations approved the fallback. Identify unresolved legacy paths and owners of any compensating controls. That is stronger evidence than a claim that vendor VPN access is protected by MFA. The work order defines why the technician is present; the technical boundary must still ensure the technician cannot turn a narrow job into authority over every mine in the group.
Sources and further reading
Explore Next Defence expertise
Next Defence can help your team evaluate the permissions and operational risks in a safer model for remote maintenance at multiple mine sites. Our specialists can review evidence such as Site routes, vendor session, maintenance ticket, gateway and engineering record, assess whether the authorised work remains usable, and test controls against the unacceptable case where the same session reaches another site’s engineering controller without approval. We can agree proportionate remediation with regional mine engineer and remote access lead, backed by a repeatable acceptance test and clear incident responsibilities.