Skip to main content
Next Defence - Next-Gen AI Cyber Security Firm
Australia & New Zealand[email protected](02) 9064 2614
INSIGHT

Utility Supplier Access Advisory: Restrict Reach Before an Incident

Security guidance for critical infrastructure and utility operators on utility supplier access advisory, with a controlled business scenario, access tests and practical response decisions.

A vendor path that spans two treatment sites

A water utility finds that an old supplier account can reach two treatment locations through one remote-support gateway. The intended activity is a named engineer diagnosing an assigned instrument during an approved maintenance window. The unacceptable alternative is an expired or compromised vendor identity moving into unrelated site systems or creating persistent access. That difference determines the response. The presence of an old credential is an exposure requiring correction; it is not evidence that treatment settings have been changed. Operations and safety personnel must remain involved because remote network changes can affect plant support.

Map reachability at each site

Inventory the supplier identity, VPN group, gateway destination rules, jump host, approved devices and site-level controls. An account labelled 'Site A' may still inherit a shared access group that permits Site B traffic. Confirm what a connection can reach from the actual gateway rather than relying on the vendor's access request. Identify whether local technicians have a separate path for emergency diagnostics and which records hold maintenance approvals. Where route documentation is missing, have the OT engineer observe sessions passively before making a restrictive change.

Use a maintenance-window test, not live process manipulation

In a supervised exercise, authenticate with a current named vendor identity and attempt an approved read-only diagnostic on a non-critical test endpoint. Then confirm that the same identity cannot open an unrelated site's engineering host. Test a retired identity at the authentication boundary without issuing control commands. Evidence should include the gateway rule evaluated, session owner, target and time. Do not use a treatment dosing change, pump command or unapproved controller write as a demonstration. Any plant-side functional check belongs under the utility's engineering change and safety procedures.

Investigate a suspicious session accurately

Collect account lifecycle records, MFA events, gateway audit trails, vendor ticket references and historian or controller activity where relevant. Time-align the supplier and utility records. A legitimate calibration or telemetry transfer may resemble unusual activity, particularly after a supplier changes its tools. Conversely, a planned ticket does not justify a session that crosses into another site. Record whether authentication succeeded, whether the destination was reached and whether an engineering operation occurred as three separate findings. If a provider cannot furnish logs, identify the uncertainty explicitly.

Contain without forcing blind operation

Retire shared or obsolete credentials, narrow destination rules to the assigned site and require time-bounded approval for elevated support. Keep local operators informed about the maintenance state and a fallback contact if support becomes unavailable. Where immediate account suspension would strand an essential repair, a named plant manager can authorise a temporary supervised route with enhanced observation and a fixed expiry. This is not a reason to leave an old multi-site account permanently enabled. Credential rotation should cover remembered sessions, integration tokens and gateway accounts, not only the portal password.

Recover the trusted support relationship

After restrictions are applied, verify a permitted diagnostic still works at the assigned site, cross-site reachability is denied and all retired accounts fail at the first control boundary. Review scheduled vendor maintenance and test whether a gateway upgrade silently reinstates broad defaults. Require the supplier to document its own leaver process and the names of staff who can request elevation. The utility should be able to revoke access without depending on the vendor to operate its service desk or submit a ticket on its behalf.

The closeout decision

Site operations accepts a before-and-after network path diagram, the two negative access tests, account retirement evidence and any open work orders. The security lead records whether the issue was limited to excessive reachability or whether corroborated activity warrants incident escalation. Executive reporting should state which treatment sites remained operational throughout the change. The outcome is a controlled supplier relationship with tested separation between plants, not a blanket assertion that a zero-trust initiative has been completed.

Test supplier exit as a routine operational control

The leaver exercise should begin when a technician leaves the support company, not when the utility discovers a suspicious session. Require the vendor to send the staff change through the agreed process, then compare its list of authorised engineers with the utility's gateway roster and access logs. A dry run can confirm whether a former engineer still holds a local account, cached VPN certificate or unattended automation credential. Sites should not inherit an unreviewed support identity simply because the purchase order or supplier legal entity has not changed.

How to report the residual risk

Distinguish a currently open multi-site gateway route from a test of attempted cross-site access that was denied. The first is a design exposure; the second provides evidence that a configured boundary works under the test conditions. Neither alone proves what occurred in earlier months. The utility's closeout note should identify the plants affected, duration of account validity, historical evidence available and any outstanding dependencies on the supplier's logs. This lets management decide proportionate follow-up without creating an unsubstantiated attack story.

How to handle diagnostic work that cannot be interrupted

During a real equipment fault, an engineer may need limited access before the utility has completed every credential review. The shift supervisor should first establish the safe local operating condition, identify the particular diagnostic command needed and approve an observed maintenance session. The exception must name the device, support person and expiry; an unowned persistent tunnel is not an acceptable substitute. After the repair, retrieve the session record, remove the temporary entitlement and compare the controller's final state with the maintenance ticket. This makes emergency support accountable without delaying a safety-critical repair unnecessarily.

Further reading and implementation support

For site-specific support permissions, Next Defence can assist with a scoped verification of ot supplier access governance, including engineering-safe test design and evidence review. Any conclusions would depend on the particular systems and records examined.

Explore the related security capability

References and guidance

LET'S TALK

Let’s talk about your security.

Tell us what you are protecting, where you need greater visibility or what you want to achieve. We will help identify the right next step.

Talk to a Security Specialist

Describe your security requirements. Please do not submit passwords, credentials or confidential incident evidence. This form is not an emergency incident-response channel.

Form powered by HubSpot. Review our Privacy Policy. If the form doesn’t load, email [email protected].