Establish the service boundary and prerequisites
A regional mine depends on a weighbridge application to reconcile outbound haulage. The security team monitors eligible business endpoints centrally, and the central and site duty teams use Teams to coordinate. During a regional link outage, the depot continues only the work permitted under its site procedure. The central team receives less information from the site. A managed operations rollout must tell the on-call people which service evidence is missing, who can make a local decision and how they will reconcile the case when connectivity returns.
Start with the service owner and the site supervisor. Record the permitted operating state during a communications failure and the work that requires a hold. Include the dispatch and weighbridge service, the business endpoints that support them and the site contacts who can verify their status. Identify who controls the connectivity paths, what monitoring can show on either side and which records are collected by a provider. Establish the approved alternate communications route and its information limits. Write down who can approve its use and who will record the resulting decisions.
ASD and partner agencies’ 2024 event logging guidance recommends a defined logging policy, centralised collection, protection of logs and a strategy for detecting relevant threats. NIST’s 2025 incident response guidance connects response preparation, detection, response and recovery to wider risk management. Its operational technology security guide sets out the need to account for safety and availability in industrial settings. Use those principles to decide which evidence supports the work and which technical changes require separate site approval. Begin with eligible business systems and approved interfaces.
Confirm the project prerequisites before installing an agent or changing a service setting. These include an asset owner, supported platforms, approved change windows, adequate retention, current time settings, authorised evidence access and a documented rollback. For Defender deployments, define the endpoints in scope and capture their current reporting state and policy assignment. Keep an approved configuration record for the Teams workspace, its members and the associated escalation channels. Define which actions the managed service provider is authorised to take and the approvals required for each affected environment.
Assign accountability across site, central operations and suppliers
The operating service owner sets the acceptable service state and the cut-offs for production and haulage decisions. The site supervisor confirms local conditions and acts under the approved procedure. The central incident lead decides which evidence should be collected and owns the main incident record. The monitoring provider receives and triages events under its agreement and should know when to reach the authorised incident lead. Give each role an alternate and a way to verify their identity during an outage.
The endpoint lead owns the approved endpoint configuration and verifies its result. The collaboration lead owns the Teams workspace configuration and access. The network provider can confirm the state of a link it controls. That confirmation should identify the site and observation time. A separate site or application owner verifies the actual weighbridge function. Document these responsibilities in the service record and give the next shift one route to find them.
Agree what can be communicated over each channel. The operations lead may need a short case reference, a service instruction and a next review time. Endpoint observations, staff details and full case evidence can remain in the restricted record. If the approved alternate is a site radio or duty telephone, record the time, acknowledgement and person who issued the instruction through the approved process. When the central channel returns, link the local record to the main case and reconcile the decisions made during the gap.
Deploy in stages with explicit acceptance checks
Start with a baseline. Observe a normal shift, a handover and one planned connectivity change. Record which systems report, how long it takes evidence to reach the monitoring team and how the site confirms service state. Capture the ordinary interval between events from relevant sources. The expected absence of a work event can differ from a loss of collection, and the duty team needs a basis for telling them apart. Decide which indicators can support a reliable monitoring-health alert.
Pilot with one eligible endpoint group and a limited response workflow. Use observation or test mode where available and approved. Record which policies apply to the pilot scope and the events the provider should receive. Run a harmless approved test using a test identity and a sample weighbridge case. Confirm the endpoint and central evidence refer to the intended device. Confirm the duty analyst can create the case, reach an authorised person and record an observed service result. Record the date and any differences between expected and observed data.
Expand only after the service and security owners accept the pilot. Add endpoint groups or sites at a pace that the duty team can support. Include a shift with different staff and one site with weaker connectivity. Give each wave a distinct scope, change record, acceptance decision and rollback owner. Keep any broader response authority subject to its own approval. An alert can be ready for wider monitoring while the provider still needs explicit authority to restrict an endpoint.
Verify collection, communications and reconciliation
For the endpoint test, confirm an eligible test device receives the intended policy and produces a documented benign test event in an approved environment. Check device identity, event time, ingestion time and the case created by the monitoring team. Confirm who can see the case and when it is escalated. If expected telemetry does not arrive, use the agreed health and evidence records to decide whether the endpoint was offline, an integration delayed ingestion or the event did not originate. Keep the explanation provisional until verified.
For the communications test, simulate an unavailable primary Teams route through an approved exercise. Do not interrupt a live operational connection for a desk-based test. Have the duty analyst notify the site through the authorised alternate and confirm who accepted the instruction. The site should show how it would check the weighbridge and record the permitted state without waiting for a central message. Confirm that the identifier and time used on the alternate route can later be matched to the central case.
For the recovery test, supply representative records from the outage period and a resumed central feed. Have the team distinguish fresh events from delayed records using their original times. Check that it recognises duplicate reports of the same incident and preserves any earlier site decision. The operations owner should verify the condition for returning to ordinary haulage records. Ask the next shift to trace a decision back to its author and evidence without relying on the participants’ recollection.
Exercise an overnight handover
Give the outgoing analyst three fictional records. One is a recent health signal from the carrier, one is a locally approved instruction recorded during the gap and one is an older endpoint event that arrived after the connection returned. Ask the incoming analyst to identify the service state, the time each observation describes and which decision is still required. The exercise passes when the analyst can find the local authorisation, identify the late evidence and tell the site which decision is pending. Record any ambiguity in the time fields or service instructions and assign the corrections before the next wave.
Ask the provider to repeat the handover with the usual incident contact unavailable. Record the first successful contact and the person who accepted ownership of the case.
Prepare rollback before every deployment wave
Agree the conditions that stop a wave. They may include an approved work task becoming inaccessible, lost monitoring coverage without an accepted alternative, or a response action outside the authorised boundary. Record who can pause the change and how the site will be informed if the central workspace is unavailable. Preserve the records needed to explain the observed result. Keep the rollback and the investigation within the approved change and evidence handling processes.
The relevant technical owner should use the documented recovery route to return the affected scope to the last accepted configuration or approved fallback. Verify the actual endpoint reporting and the approved service operation after the change. If a collaboration setting was changed, confirm access for the intended roles and test the alternate route again. Ask the site supervisor to verify the operational effect. Update the incident and change records with the times, approvals and unresolved items before any retry.
A depot with no link must still account for every haulage event
At a remote mine, the central monitoring service loses connectivity while trucks continue crossing the weighbridge. Local operators retain an approved fallback log, but security analysts do not see the relevant endpoint events until the next link window. The exercise should ask the site supervisor to maintain the safe haulage process without accepting remote instructions that cannot be verified. On reconnection, reconcile the local docket sequence, buffered endpoint telemetry and application messages by reference and time. An analyst acknowledgement timestamp is not evidence that the site received the warning. Include a duplicate or out-of-order entry to see whether recovery creates a second recorded load. The result belongs jointly to operations and security because an apparently healthy agent cannot establish the integrity of the haulage ledger.
Measure outcomes over the following 30 to 90 days
During the first 30 days, measure the proportion of in-scope endpoints with verified reporting and the time from an approved test event to a case owned by a duty analyst. Define the population and observation window. Report planned outages separately from unexplained gaps. Also track whether each pilot site has a verified alternate contact and a current handover record. Review findings with the operating owner so that a gap is understood in terms of the service and shift it affects.
By 60 days, compare time to site acknowledgement, time to a verified operating decision and the proportion of cases with traceable source records. Review unresolved provider requests and access exceptions with their accountable owners. Repeat the communications exercise with a relief supervisor or absent primary contact. Record which cases the team could operate and reconcile within the agreed time and which part of the route delayed the decision.
By 90 days, retest a previously failed control and one changed deployment scope. Check that temporary permissions and workarounds ended, that the central and site records reconcile, and that the service owner can identify residual limitations. Give the next review a decision about retaining, extending or adjusting coverage based on the evidence from the site. A mine should be able to show who acted during a communications loss, what continued and how the team verified the return to ordinary operation.
Sources and further reading
- ASD and partners, Best Practices for Event Logging and Threat Detection
- NIST, Incident Response Recommendations and Considerations for Cybersecurity Risk Management, SP 800-61 Rev. 3
- NIST, Guide to Operational Technology Security, SP 800-82 Rev. 3