Skip to main content
Next Defence - Next-Gen AI Cyber Security Firm
Australia & New Zealand[email protected](02) 9064 2614
INSIGHT

An OT remote access checklist for technology and SaaS providers

Verify who can reach customer equipment, what they can do, how access stops and how local operators maintain service.

A SaaS provider supports a customer that uses connected controls to run temperature-managed storage. The provider’s engineering team can see diagnostics through a cloud console and may need temporary remote access during a fault. The customer runs the equipment and decides whether any physical process can be interrupted. The checklist starts at that operating boundary. It helps both parties decide which activities can be performed remotely, who approves them and what the evidence needs to show.

The Australian Signals Directorate’s principles of operational technology cyber security emphasise safety, knowledge of the operating environment and protection of operational systems. ASD’s edge device guidance and NIST’s Guide to Operational Technology Security provide further context for remote access and separation. Use the checklist with the equipment owner and their approved test arrangements. A cold-room control or warehouse conveyor may require a safe local test period even when the cloud console is available every day.

Set up a checklist record for each pathway

Create one record per customer site and support pathway. In the opening fields, enter the customer site, system and equipment owner, provider owner, starting identity, gateway, target service and permitted activity. Include where the provider and customer exchange data, whether another supplier can enter the pathway and how local staff operate when it is closed. Draw the path from support workstation to target and have both owners confirm it against their own evidence.

For each check below, record the named system owner, evidence reference, Pass or Fail result, remediation priority and next review date. Mark a check Fail if evidence for a material requirement cannot be obtained. Capture the missing record, person assigned to resolve it and target date. Review the decision with the accountable owner. The suggested intervals can be shortened for a site whose availability or safety consequences require more frequent evidence.

Use Priority 1 for a failure that prevents safe operation or leaves uncontrolled access. Pause or restrict the affected path under the customer-approved process while resolving it. Priority 2 covers a material failure that can be bounded with a time-limited operating condition agreed by the customer. Priority 3 covers improvements where the control already passes and a change will make evidence easier to retrieve or review. Agree with the customer what counts as an emergency before assigning a path to the first category.

Check 1. Confirm the physical boundary and local authority

The customer OT system owner owns this check. Collect the latest equipment and network record, support agreement, site contacts and approval authority for any activity that can change process state. Identify where the provider can see telemetry and where a person can issue an instruction that affects equipment. Ask the customer to confirm who has the authority to pause, stop or restore operation during a remote support session.

Mark Pass when the customer can identify the relevant equipment, distinguish its own duties from the provider’s and reach the person who controls local operation during the agreed hours. Mark Fail if the site cannot name that decision-maker or the provider’s ability to change state is unknown. Treat an unverified path to operational changes as Priority 1. Record the next review date for the next site change or within the next quarter, whichever comes first.

Check 2. Verify the support identity, device and duration

The provider’s identity owner supplies the account and device policy, sample approval and a record of a completed support session. Ask the customer to verify how it identifies the provider’s operator and, where required, approves the session. Include a secondary supplier account if the pathway permits one. Examine what happens when an engineer changes team, leaves the provider or needs an extension.

Mark Pass when routine access identifies the individual, uses a device permitted by policy, is scoped to the assigned duty and expires as intended. Confirm through a controlled exercise that an expired grant cannot be reused and that the local support owner knows who to contact if time runs out. Mark Fail if operators share an untraceable identity or indefinite access is used for occasional work. Assign Priority 1 where that gap affects equipment control and Priority 2 for a limited diagnostic path with compensating restrictions. Set the next review after role changes or on the agreed quarterly date.

Check 3. Validate where the connection can go

The OT network owner, with the provider platform owner, collects the approved network diagram, gateway rules and access logs for a recent session. Check whether the route terminates at an agreed support point and which services can be reached from there. Verify customer separation for a provider console used across multiple sites. Include any alternate route for vendor maintenance and clarify who knows about it.

Mark Pass when the approved route is limited to the expected destination and identity, and a controlled validation shows that an out-of-scope system or tenant is inaccessible. Use a safe test target agreed with the customer. Mark Fail if a shared gateway gives unintended cross-site reach or an undocumented connection reaches the operating network. Assign Priority 1 for uncontrolled reach into operational systems. Set the next review for a gateway, firewall or tenant design change or the next quarter.

Check 4. Prove which activities the session permits

The provider service owner brings the access role configuration, a sample support ticket and evidence of task execution. The customer should approve test actions in a representative environment. Include a read-only diagnostic role and a separately authorised change role where both exist. Check which side can alter a control setting, upload a file or start a job. Examine whether the console label and effective permission agree.

Mark Pass when a routine diagnostic account cannot change settings or upload material and any separately permitted change needs the agreed approval. Record the expected and observed result for each test. Mark Fail if a standard diagnostic role can issue a write or the two modes cannot be distinguished in the record. Assign Priority 1 to an unapproved write path. Put the next review after a change to the product or support role and within the agreed review cycle.

Check 5. Control transfers and preserve support evidence

The customer information owner and provider monitoring owner should collect a sample diagnostic export, change record and gateway event. Identify what telemetry can leave the site, where it is received, how long it is retained and whether another customer or supplier has access. Verify how the team handles a diagnostic bundle with process or customer information. If files can move towards the equipment, have the site owner verify the approved source and transfer process.

Mark Pass when both parties can retrieve records tying the operator, authorised time, target and allowed action to the support ticket. The evidence should identify file transfers or configuration actions where those functions are enabled. Mark Fail if either party cannot establish what left the site or a write operation cannot be traced. Choose Priority 1 for a high-consequence control path with unverified transfers. Use Priority 2 for a bounded evidence issue that can be managed under temporary restrictions. Set a review date for the next change to the collection or transfer workflow.

Check 6. Stop a session and demonstrate local continuity

The customer’s duty operations lead owns this check. Gather the emergency contact route, the documented stop authority and the local operating procedure if the remote service becomes unavailable. During a planned window, exercise revocation with a test session. Observe how the provider and customer confirm that the connection has ended and which local functions remain available. If the remote system can initiate a queued job, establish how the customer checks for outstanding work after the connection stops.

Mark Pass when authorised staff can end the session, verify the result and maintain the agreed safe operation at the site. Record whether any access requires separate revocation at the cloud platform, gateway or target. Mark Fail if the only stop action depends on an unreachable provider contact or if the site cannot verify continued operation. Assign Priority 1. Set the next review date at the next operating exercise or after any change to the support provider or gateway.

Check 7. Reconcile unattended connections and exceptional access

The provider platform owner and the customer’s OT owner should compare the live support register with all standing connections and exceptions. Include an automated telemetry path if it uses the same gateway. Review the owner, intended direction, expected hours, associated identity and last evidence of use. Ask whether the customer can distinguish an expected automated connection from an interactive support session.

Mark Pass when each connection has a named owner, an approved purpose and an explicit review date, and exceptional support does not silently become standing access. Mark Fail when the customer and provider cannot reconcile the register. Assign Priority 1 if an unowned connection can reach a control interface. Schedule the next review after a supplier handover or material equipment upgrade.

Close the review with a joint operating decision

Have the provider and customer sign the path record after reviewing failed checks, evidence and the next review date. Give both parties a way to record an urgent change and to compare the existing route with the approved boundary. For a temporary condition, specify which tasks remain available, who watches for misuse, when the restriction expires and what evidence is needed to remove it. Send the site duty team the decision through its ordinary operating channel.

For example, a customer may continue read-only diagnostics while its provider addresses a missing event reference for a configuration change. In that case, verify that the write route is suspended, make sure local staff can still support the equipment and agree who will demonstrate the repaired logging. The next review should include one routine session and one session revocation. Close the issue when both parties can reproduce the evidence and the site owner confirms the approved operations remain available.

Separate SaaS diagnostics from control of customer equipment

For the temperature-managed storage scenario, document the precise path from the provider’s cloud console to the customer’s monitoring gateway. Identify who owns the operational endpoint, which diagnostics are read-only and whether any command can change set-points or suppress alarms. Test with a simulated cooling controller and a segregated vendor account, not the live refrigeration plant. An engineer allowed to inspect sensor history should not inherit permission to make equipment adjustments merely because the same supplier provides the dashboard.

Introduce a support request arriving after an authorised window closes. The service desk should obtain the customer’s named approval for any renewed session, including scope, duration and recording requirements. Confirm that expired access cannot be reopened with a cached credential, and that the customer’s local alarm and monitoring functions continue after the cloud connection is interrupted. Examine jump-host events, tenant context, tool permissions and the customer’s work order together. Escalate missing customer-side logs as an assurance gap, not proof of a hidden command. The final checklist should show a feasible emergency support route without normalising permanent, unobserved OT access.

Scope distinction: This temperature-managed storage scenario tests vendor diagnostics, temporary remote access and equipment continuity with the customer as operating authority. The earlier checklist establishes the more general SaaS-to-customer OT trust boundary and approval rules. Companion article: Check OT Remote Access Boundaries for SaaS and Technology Providers.

Sources and further reading

Strengthen your security with Next Defence

Ask Next Defence to assess remote support pathways and test which controls protect your customers’ operational environments.

Explore OT, IoT & Critical Infrastructure Security ↗

LET'S TALK

Let’s talk about your security.

Tell us what you are protecting, where you need greater visibility or what you want to achieve. We will help identify the right next step.

Talk to a Security Specialist

Describe your security requirements. Please do not submit passwords, credentials or confidential incident evidence. This form is not an emergency incident-response channel.

Form powered by HubSpot. Review our Privacy Policy. If the form doesn’t load, email [email protected].