Skip to main content
Next Defence - Next-Gen AI Cyber Security Firm
Australia & New Zealand[email protected](02) 9064 2614
INSIGHT

Turning Australia’s cyber threat report into continuity decisions for utilities

Use ASD’s 2024–25 report to decide which service dependencies need stronger evidence, recovery options and investment.

The Australian Signals Directorate released its Annual Cyber Threat Report 2024–25 on 14 October 2025. It describes activity by state-sponsored actors and cybercriminals and calls attention to practical priorities including better logging, replacing legacy technology, managing third-party risks and preparing for the transition to post-quantum cryptography. These subjects can reach different committees in a utility. The operations team may own replacement, the procurement team manages suppliers and technology leads plan monitoring. Leadership can bring them together by asking what each decision will change for the service the organisation must keep running.

Take a hypothetical regional water utility with remote pump stations, a central operations team, a contractor responsible for field telemetry and a customer portal. These systems have different operating constraints. A portal change may be possible at short notice, while remote operations may require staged changes across locations and a safe local fallback. The threat report offers context for setting priorities. The operating model and evidence available to the utility determine which actions it should take and in what order.

Identify a service and the decisions needed to sustain it

Ask the accountable operator to describe one critical service in terms that leadership can recognise. For a pumping network, the service owner might identify which locations can be supervised remotely, which events require an on-site response and how long staff can manage each site in local operation. Capture the safety, customer and staffing dependencies for that arrangement. A continuity decision also needs to account for season, geography and staff availability. The operator who would approve a switch to local operation should help define the required evidence.

Map the dependencies for that service. Include the operational network, remote access service, supplier support arrangements, availability of engineering records and the identity or communications services staff need. Use the utility’s safety and engineering procedures to establish the process for changes that may affect operations. ASD’s principles for operational technology cyber security and NIST’s operational technology security guide offer a reference for understanding dependencies and planning around operational constraints. They support questions for the engineers and operators who can validate how the utility actually works.

Fund logs that answer a real operational question

A utility can have separate records for remote support, central identity, network equipment and field operations. Ask the duty team to assemble the sequence for a routine supplier maintenance visit. Establish whether it can tell who approved the access, which service was reached and when the session ended. Then compare these records with the service change and the operator’s observations. If clocks differ or one system retains only part of the activity, the event sequence may be hard to establish after an incident. Document the systems that supply usable evidence and how long the evidence is available.

A leadership proposal for logging should explain which unanswered questions the investment would resolve. For example, extending retention on a gateway may help the response team establish whether a supplier account reached a field environment during an earlier maintenance window. Recording a common service or ticket identifier may make that record usable alongside the change schedule. Ask who will confirm the events are being collected and who will act on them after hours. Where the environment cannot safely produce a new feed, request a way to preserve existing records and review the limitation when the relevant equipment is replaced.

Put legacy replacement on the same agenda as continuity

Build a short list of unsupported equipment that matters to the chosen service. For each item, record the operational dependency, current access restrictions, known constraints and an achievable replacement milestone. A change request for a legacy gateway can then explain why the device matters and which sites or operating processes will be affected by its replacement. The financial decision can include the effort of keeping an interim control, availability of parts and the need for a tested fallback. Owners should set an expiry for continued use and define what would trigger a review sooner.

A remote station might stay in service temporarily with access constrained and an approved on-site maintenance path. That decision creates staffing and travel obligations. Leadership can ask whether those obligations are sustainable through the next high-demand period. If several sites need the same staff, exercise what happens when two sites require attention at once. Capture the actual mobilisation and handover times. This provides evidence to compare with the assumptions in the replacement programme and gives engineers a chance to adjust the order of site work.

Test supplier obligations with a concrete request

Take a recent approved visit and ask the provider to identify the engineer, the access window and the relevant service. Ask what incident evidence it could provide outside normal hours and who is authorised to request it. Compare the response with the contract and the utility’s own view. Where a subcontractor performs field support, confirm who retains the records and who can suspend a session. The accountable operator should know who will handle a support call if the normal remote route is suspended.

For the next contract review, describe the evidence as an observable deliverable. A confirmation of suspended supplier access could identify which identities or pathways the change covered and when it took effect. A restored support session could require a named operator’s approval and a time limit where technically feasible. Allocate access to records for authorised investigators and protect sensitive operational information according to the organisation’s procedures. A brief supplier exercise can show whether the required evidence arrives in time to inform the duty team’s decision.

Start cryptography planning with systems already in scope

For the selected service, ask which systems rely on certificates, signed updates or encrypted management channels, and which suppliers can change those arrangements. Include field devices that have long replacement cycles and software services that may introduce new dependencies. The inventory can be linked to the asset or contract owner and given a planned review date. That gives the capital planning team a way to account for future cryptography changes without selecting a particular design before compatibility and operational requirements are known.

The same exercise can expose an immediate continuity issue. A certificate used by a management service may be renewable only through a provider’s support queue. Ask what happens if renewal is delayed and test whether the right staff receive the notification. Keep the evidence with the service’s change and recovery arrangements. The work needed to maintain the current service can inform the sequence of later migration planning.

Keep the board paper tied to a decision and a check

Report a small set of matters that need a decision in the next quarter. For each, identify the service, the evidence available, the expected operating impact and the person who will confirm the result. A decision might approve a staged replacement at three sites, require a joint supplier exercise or fund a change to retain records for a longer period. Give each decision a review date and a condition that would bring it back earlier. Ask the same team that runs the service to confirm the change in a routine operating scenario.

For the pumping network, the next review might ask whether a duty officer can determine who accessed a station, whether local operations can be sustained for the expected window and whether the supplier can respond when remote access is restricted. Those answers give leadership evidence about service continuity. They also show where a specific investment or a change to a supplier arrangement can reduce the time the organisation spends making a decision without reliable information.

Translate a national threat trend into a field-service rehearsal

A utility reviewing national incident figures should not assume its own highest risk is the most frequently reported attack type. Select a single service obligation, such as dispatching a crew to inspect a faulty pump station, and map the identities, communications channels and field records it requires. Ask which failure would prevent a safe dispatch and which data must be available to restore the job record.

Use a synthetic outage involving identity access and a delayed supplier response to test that path. Distinguish a widespread advisory trend from verified local compromise. The board report can then connect threat intelligence to an observed resilience improvement: crew instructions were authenticated, work was reconciled after reconnecting and a disputed remote-support session could be withheld without losing essential monitoring.

Sources and further reading

Strengthen your security with Next Defence

Ask Next Defence to help your leadership team use the threat report to set utility and critical infrastructure continuity priorities.

Explore OT, IoT & Critical Infrastructure Security ↗

LET'S TALK

Let’s talk about your security.

Tell us what you are protecting, where you need greater visibility or what you want to achieve. We will help identify the right next step.

Talk to a Security Specialist

Describe your security requirements. Please do not submit passwords, credentials or confidential incident evidence. This form is not an emergency incident-response channel.

Form powered by HubSpot. Review our Privacy Policy. If the form doesn’t load, email [email protected].