Skip to main content
Next Defence - Next-Gen AI Cyber Security Firm
Australia & New Zealand[email protected](02) 9064 2614
INSIGHT

Secure Connected Building Systems Without Disrupting Client Work

Give law firms a phased way to secure building controls and connected devices while keeping office access, meetings and matter work available.

A law firm plans a network refresh after moving into a shared office. Its building access system, meeting rooms, environmental controls and visitor reception all have different owners. Some use the firm's networks. Others belong to the landlord or a managed supplier. A change designed for ordinary office devices can disrupt the facilities staff and clients rely on. The security work should start with those operating dependencies, define which changes the practice can authorise and move through controlled stages with evidence for each one.

Identify the connected services that matter to the practice

Choose one site and follow an ordinary working day. Record how staff and visitors enter, how reception verifies access, which room equipment is connected and what services the facilities team uses after hours. Identify the devices, connectivity, administrators and supplier support involved. Do not assume the practice owns every system visible in the office. A landlord may own a controller and its support arrangement while the firm manages an office network or shares an identity feed. Ask which party can approve changes and verify the result.

NIST's OT guide includes building automation and physical access control among its examples. Its emphasis on performance, reliability and safety matters in a professional office as well as a factory. The risk to a law firm might be loss of authorised access, unavailable client rooms or the ability of a supplier connection to reach other systems. Identify the actual consequence and who owns the decision. If a building service has a safety role, involve the responsible facilities owner and use approved operating arrangements before undertaking any change.

Compare the network boundary with the service boundary

Build a small map showing the office network, guest connections, building services, internet-facing devices and supplier support routes. Use authorised inventory, diagrams and owner interviews to establish what is known. Ask which systems need to exchange information and under which conditions. A meeting room appliance might need a managed service and internet connectivity without needing access to matter records. A landlord's service may need a dedicated interface rather than access to general office systems. Separate the question of reachability from the question of what users or support identities can do.

Give each boundary an evidence owner. The network team can confirm a route, the facilities owner can confirm the operating dependency and the supplier can describe approved support. Check that the evidence refers to the right site and configuration. An inherited diagram may omit an appliance added during a fit-out. A supplier may describe its standard product without confirming the customer's arrangement. Record uncertainties and give them a date. If an independent change is not authorised, request approved evidence from the owner.

Plan a phased rollout around real appointments and duties

Start with an observation phase. Ask the facilities and practice teams to verify a few ordinary workflows without changing live systems. For example, confirm how a visitor is admitted, how authorised staff reach a meeting room and what the firm can observe if a provider uses support. Record which workflow would be affected by narrowing network access. Agree the ordinary timetable, peak periods and approved fallback. This makes the operating requirement visible before the architecture is finalised.

For a first change, choose a narrow, reversible boundary and verify it in an agreed test or maintenance window. A representative test might show an approved room device still reaches its required service and cannot use a connection outside its intended purpose. Give the technical owner responsibility for verifying the configuration and the office owner responsibility for accepting the work. Use fictional meeting or access records where appropriate. Decide in advance which observation would stop the change and who can authorise rollback.

Expand only after a different owner can reproduce the check. A second office may use a different landlord or support route. Reuse the evidence fields and test the differences rather than treating one building's result as proof for all locations. Give any interim exception a scope, owner and review date. A staged rollout should show which connections were narrowed, which operating outcome was retained and what still requires provider evidence.

Make supplier access testable

Ask each provider which identity, service and route it uses for support. Establish whether it can work only during an approved period, how the practice or facilities owner can verify its use and what happens when the support arrangement ends. Give the provider and customer separate responsibilities for approving, applying and observing changes. ASD's principles of OT cyber security include the importance of knowing the environment and protecting operational data. Ask how those ideas apply to the support that actually operates the office's connected services.

Use a fictional support request. Ask the duty manager to find the approved contact, identify the service and show which evidence establishes a grant and its withdrawal. If a supplier can act without the firm's approval, find out which party has that authority and where the firm can obtain an independent observation. If the supplier's service is shared across several tenants, confirm who can speak for the landlord. Avoid resolving the uncertainty by requesting wider access to a system the practice does not own.

Practise an interruption during a client appointment

Give the duty team a scenario in which one connected service becomes unavailable just before a sensitive meeting. Ask the office lead to identify the approved fallback and what information staff need to continue. If a network restriction is under review, have the technical owner state what it affects and when another decision is due. Give staff a route to reach facilities support independent of the affected system. Ensure the scenario never requires bypassing physical security or other building safety controls.

Test restoration with the right owners. Confirm that authorised staff can complete the intended workflow and any temporary access has ended. Compare the resulting state with the agreed baseline. Ask what the next shift can verify and which fact still needs a supplier. If the recovery could restore an obsolete network route or support grant, give that issue its own check before accepting the service. Preserve the evidence with the change and facilities records.

The lease renewal test that a network diagram misses

Before renewing the shared-office lease, run a paper exercise with the property manager: a new access-control contractor replaces the previous one, but its remote diagnostics still depend on a link through the firm’s switch. The facilities register should identify whose permission changes, who disables the previous account, and who confirms that reception can still admit an expected visitor. Compare the landlord’s approved support window with the practice’s client appointment schedule. Keep the fictional visitor’s name outside any supplier ticket. A network diagram showing a segregated building VLAN would not demonstrate that the old provider lost its ability to administer the door controller. This distinction belongs in the lease and support handover, not only in a technical change request.

Turn the result into an operating commitment

Report coverage by site and service. Include the percentage of in-scope devices or support paths with verified ownership, the operating workflows demonstrated and material conditions that remain outside the evidence. Show the time to reach the right decision owner and whether the approved fallback worked. Ask the office, facilities and technology owners to review one unresolved issue together. An outdated landlord contact needs a different fix from a device without an approved network boundary.

Use the next fit-out, supplier renewal or site move to repeat the test. Ask a new duty person to find the contact, evidence and approved action without relying on the original project team. Document who will verify that an old support route or device is retired. A practice can improve the security of its connected services while preserving client work when every change has a real owner, observable result and tested operating fallback.

Include the landlord in that retest when its services share the affected boundary. Record who verified that ordinary facilities work still proceeds after the practice's change.

Keep that observation with the building record.

Scope distinction: This office-move scenario tests who can authorise building-system changes and how client-facing facilities continue during a network refresh. The later connected-office review extends the inventory to ongoing third-party remote access and device ownership. Companion article: Legal Practice Connected Offices: Secure Facilities Without Disrupting Client Work.

Sources and further reading

Strengthen your security with Next Defence

Next Defence can help legal and professional services firms review building and connected device boundaries, coordinate suppliers and test a safer rollout.

Explore OT, IoT & Critical Infrastructure Security ↗

LET'S TALK

Let’s talk about your security.

Tell us what you are protecting, where you need greater visibility or what you want to achieve. We will help identify the right next step.

Talk to a Security Specialist

Describe your security requirements. Please do not submit passwords, credentials or confidential incident evidence. This form is not an emergency incident-response channel.

Form powered by HubSpot. Review our Privacy Policy. If the form doesn’t load, email [email protected].