INSIGHT

Tabletop a Compromised Supplier Dependency in an Energy Maintenance Release

Exercise a supplier dependency alert that reaches several maintenance builds, including a contractor-managed release and a recovery image.

An energy operator learns that a supplier is investigating the integrity of a software component used in its maintenance planning application. The component does not appear by name in the software installed at site. It is included in more than one release assembled by an internal team or an approved contractor. An outage is scheduled for the next morning, and the operations lead needs to know whether staff can rely on the work packs prepared through that application. This tabletop exercises decisions about dependency evidence and the integrity of work already produced. It uses fictional artefacts, applications and operating decisions. Keep all exercise activity separate from live systems.

Prepare the evidence and the teams

Allow two hours and assign a facilitator and observer. Ask the sponsor to select one representative maintenance workflow. Prepare a work pack that includes fictional asset references, an approval record and a scheduled inspection. Identify the legitimate sources the site would normally use to verify the work. Give the operating lead authority for the exercise’s decision about which tasks can proceed. The incident lead owns the scope and decision timeline. The application owner and build team establish release and component evidence. Procurement and a supplier liaison verify external communications, and the communications owner prepares updates. Give the exercise controller authority to pause if a real incident or safety concern arises.

Build three sample releases. One is an internally assembled maintenance application with a retained dependency inventory. One is a contractor-managed variant with a separate component declaration. The third is a previous release held in a recovery image. Prepare a deployment history, two synthetic component lists, a receipt for the recovery image and a schedule of completed and pending work packs. Give each artefact an identifier, source and time. Add one discrepancy that requires a second record to resolve. A useful exercise should distinguish a component the supplier distributed, a component included in a build and a build actually deployed or recovered.

Use NIST’s software development and supply-chain guidance to frame the evidence requests. A component inventory can help locate a dependency. Deployment evidence is still needed to establish where the release ran. An integrity claim about the contractor’s own product should apply to the actual package the operator received. ASD’s OT principles and NIST’s OT security guidance offer context for decisions that affect essential work. In this exercise, the maintenance application provides records and planning information. Participants must never act on simulated work packs or modify operational systems.

Inject one at minute zero: a component supplier raises an integrity concern

Provide a simulated notice from the component supplier. It identifies a family of releases and says its review is ongoing. It does not establish that the operator’s products are affected. Ask the supplier liaison to verify the notice through a contact the operator already knows. Ask the build team which internal and supplier-provided records can establish component use. Give them the internal release list and the incomplete contractor declaration. Require the incident lead to distinguish confirmed, excluded and unknown states and set a time to review the first scope decision.

At the first decision gate, ask whether to hold the next maintenance application release, an internal build or a separate recovery action. Give the software owner responsibility for identifying all approved distribution routes and verifying a hold where the operator controls it. Ask procurement to identify the authority to request action from the contractor. Record which services can continue while the hold is in effect and what new evidence would change the decision. If a proposed hold would prevent an urgent approved correction, have the operating and incident owners compare the options and record who can approve an exception.

Inject two at minute twenty: one release is confirmed and a work pack is questioned

Give the team a synthetic dependency record confirming the affected component in one internal build and a deployment receipt for a planning service used the previous day. Provide a separate report from the site that two versions of a work pack show different asset references. The difference may reflect a legitimate edit, a data issue or unrelated activity. Ask the technical and operating owners to record which evidence can resolve it. An affected dependency establishes a scope decision. It does not, by itself, establish that the work pack changed because of the component.

At the second decision gate, ask which work packs the site can continue to use. Give the operating lead a controlled set of approved source records and ask who can compare a fictional work pack with them. Choose which tasks can be verified, which require another approval and which must remain held. The incident lead should preserve original evidence and assign any unresolved integrity question. Have the observer note whether participants preserve the distinction between the software investigation and the decision about the maintenance record. Record the impact if a work pack cannot be accepted before the outage window.

Inject three at minute forty: the contractor reports an exclusion without enough evidence

Give procurement a simulated note saying the contractor has excluded its release. The note names the product version but does not identify the actual package delivered to the operator. Ask what evidence would support reliance on the exclusion. The liaison should request customer-specific package and component information through the approved route. The application owner should identify which receipt or deployment record can match it. Ask what the site can verify if the contractor cannot supply the evidence until the next shift.

Have the communications owner prepare an internal update with three fields in prose. State the verified service and release, the operating decision and the next review. Give it to a participant who did not take part in the earlier discussion. They should be able to identify what remains held and where to obtain an approved alternative. Ask them to explain whether the contractor’s statement changes the operating decision and on what basis. The observer should distinguish a message received from evidence that allows the team to change scope.

Inject four at minute sixty: recovery would restore an affected dependency

Provide a synthetic recovery record showing that the available image contains the same component family, with its exact version unresolved. The outage planner asks to restore it so the planning team can use the application. Ask the software owner what can be established without starting the image in a live environment. Ask the operating owner whether the established alternative is still usable and who can authorise a change. Give the incident lead a separate responsibility for evidence preservation. A decision to recover an application and a decision to resume reliance on its output may need different evidence.

At the third decision gate, require a recovery acceptance plan. It should identify a trusted source, affected component and release references, an approved test environment and a representative work pack comparison. Ask the technical reviewer to verify the tested build and the operating owner to check the records that staff will use. Include a check that an ordinary recovery process cannot restore the version already held. If a part of the plan depends on an external supplier, assign the request and state what the site will do if it cannot obtain confirmation in time.

Inject five at minute eighty: replacement and reconciliation decisions separate

Give the group a simulated verified update identifying the affected component versions and an approved replacement release. Ask the build owner to match the release to the component evidence and trace it to the representative environment. Ask the operating owner to compare one synthetic work pack with the approved source and decide whether the application can support ordinary work again. Give another participant responsibility for reconciling earlier work packs and recording exceptions. The test should show which items can be trusted, which need reapproval and which remain part of the investigation.

Have a new duty lead take the handover. Give them the confirmed release scope, deployment hold, accepted replacement, outstanding work pack checks and time of the next review. They should be able to identify the approved operating state and the evidence needed before changing it. Ask whether a contracted release or recovery image remains unverified and who owns the follow-up. Record when any temporary rights or alternative procedures will end. Close the scenario when a second person can explain both the software status and the decision about the work.

Turn the observations into an improvement register

Rate notice verification, component-to-release tracing, work pack integrity, operating authority, recovery and handover as demonstrated, partly demonstrated or unverified. Record the time and observed evidence behind each rating. For example, the contractor’s evidence might identify its release but fail to identify the delivered package. Give that gap a procurement owner, a due date and a supplier demonstration as the acceptance check. A missing recovery inventory may need a separate technical owner and a repeatable restoration test. Do not close the action when the owner merely accepts it.

Ask the sponsor to choose one issue for a retest before the next comparable maintenance window. Measure time to identify an affected release, reach an operating decision and verify a representative work record. Have the next shift locate the approved evidence without the exercise designer. Review the contract where customer-specific component, release or recovery evidence was missing. Verify the improvement on a fictional second release. This gives the operator a way to show how a supplier notice reaches its builds, which work can continue and what evidence supports a safe return.

Include one approved work pack that was issued before the affected deployment. Have a reviewer verify its timestamp and release reference and explain how the team will record its disposition separately from the later work.

Follow the suspect component into a maintenance work pack

Give the energy operator a simulated software bill of materials that lists the suspect library under a dependency of the planning application, not under its public product name. The maintainer should trace the affected version to a scheduled turbine inspection pack without assuming that every already-issued instruction is compromised. Introduce a contractor who has printed instructions and is travelling to site; procurement can suspend the next package download, but operations must decide whether the current job can safely continue on verified instructions. Ask the supplier to supply a replacement build and provenance statement, then compare its dependency chain with the inventory rather than accepting a new signature alone. Reconciliation should cover the work-pack revision, the crew’s acknowledgement and any maintenance data entered during the hold. The exercise passes when an engineering authority can explain which jobs are affected, what remains safe to perform and how a restored planning system avoids reintroducing the untrusted component.

Sources and further reading

Strengthen your security with Next Defence

Next Defence can help mining and energy teams rehearse software supply-chain incidents with evidence from build, procurement and site operations.

Explore Application Security & DevSecOps ↗

LET'S TALK

Let’s talk about your security.

Tell us what you are protecting, where you need greater visibility or what you want to achieve. We will help identify the right next step.

Talk to a Security Specialist

Describe your security requirements. Please do not submit passwords, credentials or confidential incident evidence. This form is not an emergency incident-response channel.

Form powered by HubSpot. Review our Privacy Policy. If the form doesn’t load, email [email protected].