A utility depends on several telecommunications services. Some carry office traffic, others support remote site monitoring and a separate provider enables contractor access. A security alert about a connection is useful only if the utility can say what the route supports, what evidence is available and who can act. The operating question is not simply whether the utility monitors network activity. It is whether its own staff and providers can distinguish an ordinary service change from activity that calls for a response.
Map the connections that matter to operations
Select a representative essential workflow. It might rely on field communications, a remote monitoring link or an approved support connection. Identify the organisation responsible for each path, the service it supports and the person who can approve changes. Record dependencies on local and central infrastructure, including shared providers and alternate routes. Ask the site owner what happens when a link is unavailable and what information is needed to decide whether work can continue.
Include management and maintenance paths alongside ordinary service traffic. A connection used by a provider to support equipment can have different authority from a connection that carries routine data. Confirm which identities or organisations can use it, where approval is recorded and what the utility can observe. Verify the documentation with the provider and an operating owner. A logical diagram may omit a temporary circuit or a path used only after hours. Record which evidence establishes the current configuration and when it was checked.
Decide which observations should trigger action
Write down the security questions the duty team needs to answer. For example, was an approved provider session opened within the agreed window? Did a new management connection appear? Has a source of monitoring data stopped arriving? For each question, identify the source that can support an answer and the people who need it. A broad volume of events can be less useful than a few reliable records that identify the service, expected owner and action.
Use the August 2024 ASD and partner guidance on event logging and threat detection to inform what needs to be collected, retained and correlated. Apply it to the utility’s actual operating conditions. Ask the provider to demonstrate a representative approved event. Confirm its timestamp, service identifier and the action it can establish. If a source reports a connection but cannot identify the actor, record what other evidence would be needed. Test whether a collection delay could be mistaken for an absence of activity.
Make provider responsibilities part of the detection design
For each provider connection, ask who can observe changes, receive an alert and provide evidence. Identify which records the utility can access directly and which depend on the provider. Ask what customer-specific information will be available during an outage or suspected incident. Establish the approved route for an urgent request and the person who will follow up. Confirm that the ordinary contact method does not rely entirely on the affected telecommunications service.
Use a synthetic incident to compare the evidence. Ask the provider to show an approved service change or support session and the utility to identify the business service affected. Agree a common reference and a way to compare timestamps. Ask what the provider can confirm about a delayed or incomplete event and what the site can verify independently. Document where a provider’s records show a change to its network and where separate evidence is needed to establish the effect on the utility’s equipment or service.
Build the response around operating authority
Set out who can verify an alert, recommend a restriction and decide whether it is safe to apply. A security analyst may be able to investigate an identity or request a provider action. A site or service owner may need to approve any change affecting essential communications. ASD’s principles for OT cyber security and NIST’s OT guide give context for taking safety, reliability and operating constraints into account. Put those responsibilities into a record that works at the time of the incident.
Exercise a representative case in which a supplier session appears outside an agreed window. Give the duty team synthetic evidence, one available provider contact and one site with limited connectivity. Ask which connection is involved, what work is scheduled and what options the team can verify. Have the authorised owner decide whether to hold the session or use an approved alternative. Confirm the resulting state using separate evidence. If the team cannot obtain confirmation, agree what work can proceed and when the decision will be reviewed.
Test detection when the connection is degraded
A loss of communication can affect the service and the records used to investigate it. Simulate a delay in one source and ask analysts to identify the last verified event. Have the site confirm what can be observed locally. Check whether a fallback provides the essential operational information and whether temporary arrangements can be withdrawn when the main service returns. Record who can verify service restoration and what evidence remains dependent on the provider.
Include a change of shift. Ask the incoming owner to identify the affected connection, what has been confirmed and the next decision due. They should know which work can continue, which data is stale and where to reach the provider independently. Use the handover to identify missing records and contacts. A monitoring design should be judged in part by how it performs when the primary communications path or usual support person is unavailable.
Give leaders measures they can verify
Report coverage by essential service and connection owner. Show which provider evidence was tested, how long it took to reach an accountable decision and whether the resulting action was independently verified. Separate unknown paths from known exposures and describe the operating effect of each priority gap. Give each issue an owner and an acceptance test. A gap in an after-hours contact needs a different correction from one in event collection or access approval.
Repeat the exercise after a provider, circuit or support arrangement changes. Ask the site and supplier to verify the current route and an authorised event. Confirm that an obsolete route or contact has been withdrawn and that the expected service can still operate. The result should show which communications the utility depends on, what it can detect and how it can act without losing control of the operating decision.
Verify which apparent redundancies share a dependency
Ask the service owner to compare the primary and alternate communications paths. They may use different contracts and still depend on the same site equipment, power, management service or provider support desk. Ask each provider to confirm what it can establish about the relevant dependency. Test the alternate path using approved synthetic activity and observe whether the duty team can access the expected records through it. Record how the site will distinguish a loss of visibility from a loss of the underlying service.
Use the result to adjust the evidence and response plan. A fallback that maintains field communication but provides less monitoring may still be useful if the operating owner knows the limits and sets a review time. Identify which events are recorded during the fallback and how they will be reconciled after normal service returns. Ask a second shift to locate the same instructions and confirm which parts were actually tested.
Follow a telecommunications alert through the utility topology
A connection anomaly only becomes actionable once the affected circuit is associated with a meter network, remote telemetry feed, office service or supplier maintenance route. Ask each carrier for the identifiers and timestamps needed to match its fault notices with the utility’s gateway and monitoring events. Choose a simulated circuit degradation and establish whether the control room receives a useful service-impact explanation, not merely a generic packet-loss alarm. The exercise should also show who can authorise a temporary alternate path and how that path is withdrawn when the primary service returns. If a carrier cannot provide device-level evidence, identify exactly what can still be established from local firewall, routing and application logs. Agree how long the utility will wait for third-party confirmation before acting to protect critical monitoring. The outcome is an operating escalation, not just another telecommunications dashboard.
Sources and further reading
- ASD and partners, Best Practices for Event Logging and Threat Detection
- ASD and partners, Principles of Operational Technology Cyber Security
- NIST Guide to Operational Technology Security, SP 800-82 Rev. 3
Strengthen your security with Next Defence
Next Defence can help utilities assess telecommunications dependencies and design detection and response around the services those connections support.