Exercise a Suspected Credential Theft at a Remote Mine Site

Rehearse how a mine site, service desk and supplier verify an identity concern and maintain approved work when communications are limited.

A maintenance contractor tells a supervisor that an engineer received an unexpected account recovery notification. The same engineer is expected to support a scheduled job that morning. A central identity service recorded activity, but the local site is between communications windows. This exercise asks the operator to decide what it can verify, which access should be reviewed and how legitimate maintenance can continue. Use fictional identities, simulated records and approved exercise channels. Keep all test activity separate from live equipment and working accounts.

Select a maintenance workflow and define the exercise

Choose a job that uses a contractor account or an external support portal. Describe what the contractor must do, the systems involved and who can approve access. Give the site an operating window, an approved fallback and a clear role for the person who can stop or reschedule the work. Include a service desk, an identity owner, an incident lead, a site supervisor and a supplier contact. Give one person responsibility for exercise control and another for observing decisions.

Set outcomes that can be demonstrated. The team should be able to verify the supplier contact, identify the affected identity, decide which service access to restrict and show how approved work will proceed. It should be able to hand the decision to another shift and verify that the ordinary access state is restored. Agree that exercise messages will not be sent to real external parties and that simulated actions must use test identities or discussion. Give participants a way to distinguish the exercise from an actual incident.

Prepare a fictional job ticket, a supplier roster and a small set of identity and application records. Include one central identity, a separate supplier account and a local support role. Give each an owner and define what the exercise records can establish. Create a contact list with an independently verified route to the supplier. Give the site a limited connectivity scenario, such as a period when the central dashboard cannot be reached. Ask the observer to note which information is still available locally.

Start with a report that needs verification

Send the simulated notification to the site supervisor. It states that the engineer received an unexpected recovery message and denies initiating it. Ask the supervisor how they will verify the report without relying on contact details supplied in the disputed message. Have the service desk identify the relevant identity and application. Ask the incident lead to create an initial record of known facts, uncertainties and the next decisions. ASD’s business email compromise guidance emphasises independently verifying sensitive requests. Apply that principle to changes in account recovery or supplier authority.

Give participants a successful sign-in record for the central account and a separate record showing a legitimate maintenance request. Ask them to explain what those records do and do not show. The maintenance approval can establish the work was scheduled. It may not establish who is currently using the account. A sign-in record can establish that a particular identity authenticated but may leave uncertainty about the person or subsequent activity. Record the extra evidence needed for each conclusion and assign an owner.

Have the supplier confirm that its own account list is still under review. Give the site a limited period before the job would normally begin. Ask the site supervisor what would allow the work to continue under the approved arrangement. The group should discuss whether a different named engineer can be used, whether the work can proceed locally or whether it needs to wait. Record who has operating authority and what the team will tell the incoming shift.

Decide which access to restrict and verify the action

Give the identity owner a synthetic record indicating that the affected account may still have an active application session. Ask the team to identify the central account, the application session and any supplier-controlled access separately. Decide which action is justified by the evidence and who can approve it. The team might restrict the account, request a supplier action or temporarily hold a support session. Have an authorised reviewer identify what would confirm that each action succeeded.

Test the effect on legitimate work using a separate test identity or a discussion of the agreed fallback. A broad shutdown of supplier access may be unnecessary if the site can safely hold one session and verify the replacement engineer. Conversely, a local site may need to suspend the entire affected route until the service owner can establish what it permits. Have the operating owner record the service impact, review time and alternate route. Give unresolved supplier actions a named contact and follow-up time.

Ask the observer to track the difference between the decision, instruction and confirmed result. A support ticket can show that the change was requested. It may not confirm that an application session ended or that another account lost its rights. Use the available test evidence to verify the expected state. If a source is unavailable, record the gap and the operating decision it affects. Have the incident lead tell the next shift which conditions must be met before work can resume.

Add an operating constraint and a shift change

In the second exercise message, the original engineer is unavailable and the replacement has been approved by the supplier but has not yet been authorised for the site. The maintenance window is shrinking. Ask the site and identity owners to work through the approved process. Confirm who verifies the replacement, who grants the limited role and who can observe it. Check that the role is tied to the intended job and expiry. Preserve the ordinary operating authority rather than giving the incoming engineer the former account’s access by default.

In a later message, delay communications with the central team until after the next shift. Have the outgoing supervisor write a handover identifying the affected identity, restrictions, maintenance decision and outstanding evidence. Ask the incoming supervisor to locate the verified contact and explain which work can continue. Give the observer a way to identify any instruction that requires records the site cannot access. If the process depends on a live portal, agree a supported way to obtain the minimum information during a communications interruption.

Verify recovery and return of ordinary authority

Ask the incident lead what evidence would justify restoring the original account or closing the issue. Use a simulated update from the supplier with account and access confirmation. Verify the relevant identity and application states through approved means. Decide whether an existing authorisation should be renewed, whether a separate session needs review and how to remove temporary roles. Have the operating owner confirm the status of the job and how staff will reconcile any work that was delayed.

Discuss the scope of any investigation that continues after access returns. A verified replacement can let the site finish approved work while the incident lead still examines the earlier activity. Record these decisions separately. Ask which evidence can be retained locally and which records are held by central teams or the supplier. Use approved channels and avoid including account recovery information or other sensitive values in the handover. Establish who will follow up when communications are available.

Give the exercise a clear closure condition. The site should be able to show which job was performed, by whom and under what authority. The technology team should be able to show which permissions were restricted or restored and which actions remain outstanding. Ask the supplier liaison to confirm any agreed evidence and record the next review. The exercise should end with a record a person on the next shift can use.

Score the results and schedule a retest

Rate verification, scope, containment, continuity, handover and recovery as demonstrated, partly demonstrated or unverified. Record the reason and evidence for each outcome. For a gap in local contacts, have the site verify a current approved list through another exercise. For an incomplete application record, ask the supplier to demonstrate the evidence it can provide. For an unclear maintenance decision, revise the authority map and test it with a different roster.

Keep a short list of measurable outcomes, including the time to reach the right owner, the time to verify the restriction and whether approved work could proceed. Compare the results across conditions rather than treating the first exercise as proof for every site. Select a second location or supplier whose access arrangement differs. Reuse the core evidence and handover requirements. This gives the operator a way to measure improvement in the work people will actually need to do.

Before the next test, ask the site to check whether the approved contact or maintenance arrangement changed. Have a new duty person locate the revised record and explain who can grant or end access. If they need to call the original exercise designer, improve the instructions and repeat the handover. That makes the response less dependent on individual knowledge and better suited to a real shift change.

Verify the replacement can finish the job

Give the replacement engineer a synthetic task with one approved input and one record that should remain outside the role. Have the site observe that the permitted work can be completed and that the separate information remains restricted. Check the approval identifier and confirm that the access ends at the agreed time. If the site cannot observe the access directly, ask the service owner and supplier to show the evidence they would exchange. Record which local action can be completed while the evidence is outstanding and when another decision is due. Use that result to decide whether a future exercise needs a different fallback.

Record that result with the named job owner before the next operating review.

Exercise a contractor identity incident without stopping the mine job

Start the scenario with a maintenance engineer’s account showing an unexplained recovery event shortly before a planned site visit. The central identity analyst can suspend the suspicious session, but the shift supervisor must decide whether a safely isolated maintenance activity can proceed with another approved worker. Provide a mock work order, current access roster and vendor jump-host record and ask the participants to reconcile them; an employment name in the roster is not evidence that this specific remote session was authorised. A simulated replacement worker should obtain time-bound access for the correct asset only, with an explicit expiry at shift handover. Test that the former account cannot reconnect through an older support route or cached local entitlement, using an isolated replica rather than live controllers. Introduce poor communications between the remote site and central security and ask the supervisor to record a safe deferred decision. The exercise passes when operations can identify who may approve work, security can demonstrate session restriction, and both can show the maintenance outcome and access revocation to the incoming shift.

Sources and further reading

Strengthen your security with Next Defence

Next Defence can design and facilitate a credential incident exercise around your remote sites, suppliers, field teams and shift handovers.

Explore Cloud, Identity & Data Security ↗

LET'S TALK

Let’s talk about your security.

Tell us what you are protecting, where you need greater visibility or what you want to achieve. We will help identify the right next step.

Talk to a Security Specialist

Describe your security requirements. Please do not submit passwords, credentials or confidential incident evidence. This form is not an emergency incident-response channel.

Form powered by HubSpot. Review our Privacy Policy. If the form doesn’t load, email [email protected].