Skip to main content
Next Defence - Next-Gen AI Cyber Security Firm
Australia & New Zealand[email protected](02) 9064 2614
INSIGHT

IT-to-OT Segmentation Gaps: An Advisory for Utilities and Critical Infrastructure

Identify unexpected connections between corporate and operational networks and coordinate containment with the people responsible for plant safety.

A utility may have separate corporate and operational networks while relying on connections between them for reporting, vendor support or maintenance. A new integration can broaden the reach of a trusted system without drawing attention to the change. If monitoring identifies unexpected traffic near an operational technology boundary, the response needs to establish what can communicate and what the plant relies on before a connection is changed.

Start with the service and its safe operating conditions

Name the process affected, the site responsible and the operating state. A water treatment process, energy facility or remote pumping station can have very different dependencies and failure modes. Include control room operators, site engineering and whoever can authorise changes under the site's safety arrangements. Confirm which monitoring, alarms and communication paths must remain available.

ASD's October 2024 principles for OT cybersecurity place safety first and call for segmentation and segregation of OT from other networks. Applying those principles begins with an accurate view of both the intended connections and the ones actually in use. Draw the boundary for the process under review and mark the systems that pass information through it, including the people and support arrangements behind each connection.

Compare approved paths with observed traffic

Review available firewall rules, network diagrams, access approvals and centrally collected logs. A documented reporting connection should have an expected direction, known endpoints and an owner. Compare the observed activity with those details. Record the time and operating state, since a legitimate maintenance window can explain traffic absent from normal operations. Have the site team identify dependencies an external analyst might overlook.

Common areas for review include engineering workstations with access to several zones, management connections shared by multiple sites and third-party connections established for a particular maintenance task. Ask whether an exception expires and whether an operator can tell when it is being used. Use passive records where possible and have site engineering approve any additional validation. Some production devices and protocols require careful handling to preserve availability.

Decide what to restrict, and in which order

If a corporate identity or workstation appears implicated, the initial containment step may be available on the corporate side of the boundary. Confirm that any action preserves the controls and communication paths the site needs. Where the concern involves a vendor path, coordinate with the plant owner before terminating access, especially if work is in progress. Capture enough evidence to identify the session and preserve the basis for the change.

Consider a site where corporate systems receive telemetry for maintenance reporting. If security observes traffic in an unexpected direction, the control room should confirm whether the reporting system also supports an operational dependency. The network team can then determine whether a narrower restriction would address the concern while retaining approved traffic. Keep a record of the expected effect, how the operator will verify it and who can authorise rollback.

Investigate the gap alongside the immediate alert

A configuration review should establish when the connection was approved and whether later changes expanded its scope. Compare administrative actions to work orders and contact the person who authorised the most recent change. If a boundary device has limited logging, gather independent evidence from systems on either side and record any gaps. Treat uncertain attribution as a question to investigate, especially when an account is shared between teams.

Separate the incident decision from the improvement work. The immediate decision may be to restrict one connection and watch for related activity. The improvement may be to redesign the reporting path or introduce a more narrowly scoped support arrangement. Keep both attached to the same service owner so the long-term fix reflects the dependency that emerged during the response.

Verify the boundary under ordinary and exceptional conditions

During an approved validation window, have the relevant network and operations teams confirm the permitted connection and show that an unrelated path is denied. Check that operators can still see the expected alarms and process data. Record the results in the change record, including any test the site could not safely perform. A diagram then becomes an accurate description of the boundary under the conditions the teams have verified.

Review how the site operates when a central service, supplier connection or reporting link is unavailable. An approved local operating procedure can give responders time to isolate a suspicious path. Make sure the people rostered for the next shift know how to invoke it. Update the asset records and review temporary exceptions on their due dates. The objective is a network boundary the security team can investigate and the control room can operate through a disruption.

In the review after the incident, ask operators which information was available when they had to make the first decision. A firewall screenshot may tell engineering what rule was active. The operator also needs to know which service depends on the rule and what the plant will do if it changes. Add that information to the boundary register while the dependency is fresh, and assign the person who can keep it current.

Test whether a business account can cross into plant control

A utility may discover that an enterprise support network has a route towards an industrial data collector. Trace the path beyond its firewall rule to the actual protocol and receiving service. A harmless connection to a read-only historian may be intended, while a path that accepts configuration writes to a controller requires a different response. Identify which organisation owns each gateway and record what the receiving system accepted, not just what the network allowed.

Use a lab or maintenance simulation to confirm that an unapproved enterprise identity cannot issue a control change, while approved local operators retain the functions needed for safety. During remediation, document any process alarms or dependencies that could be affected by segmentation changes. A completed rule change is a preliminary control result; the utility operations owner must approve the continuing service and the rejected path under the conditions that triggered concern.

Sources and further reading

Strengthen your security with Next Defence

Next Defence helps infrastructure operators review IT and OT boundaries, identify unapproved dependencies and design defensive validation with operational and safety teams.

Explore OT, IoT & Critical Infrastructure Security ↗

LET'S TALK

Let’s talk about your security.

Tell us what you are protecting, where you need greater visibility or what you want to achieve. We will help identify the right next step.

Talk to a Security Specialist

Describe your security requirements. Please do not submit passwords, credentials or confidential incident evidence. This form is not an emergency incident-response channel.

Form powered by HubSpot. Review our Privacy Policy. If the form doesn’t load, email [email protected].