Operational Technology Connection Map for a Pumping Station

A utility proposes connecting a pumping-station PLC to a supplier's remote performance dashboard. The commercial request sounds simple: send pump speed and alarm telemetry to improve maintenance.

A read-only dashboard can introduce a write-capable route

A utility proposes connecting a pumping-station PLC to a supplier’s remote performance dashboard. The commercial request sounds simple: send pump speed and alarm telemetry to improve maintenance. Yet the connector may also maintain a remote-management tunnel, open an inbound protocol session or reuse an engineering account with write privileges. A network diagram that shows a line labelled “monitoring” does not prove that the path is one-way or safe. In operational technology, those distinctions can affect physical service and personnel safety.

The connection map must begin with the plant’s approved operating model. Identify pumps, PLCs, remote terminal units, local HMI, engineering workstation, historian, telemetry broker, control centre and external supplier endpoints. Include safety interlocks, process protections and any manual operating arrangements. Engineering staff should lead decisions about acceptable disruption; cyber staff should not actively probe live PLC functions to discover what a connection might do.

Record direction and authority for each trust boundary

For every connection, specify the initiating host, destination, network segment, port and protocol, authentication mechanism, data classification and business purpose. Add the actual device and service-account identities rather than generic “supplier” labels. Differentiate connection establishment direction from data-flow direction: an outbound VPN from the station can still create a bidirectional management path once established. Similarly, a firewall rule limiting destination IPs may not limit the commands allowed inside an authorised industrial protocol.

Describe who can alter PLC logic, acknowledge alarms, change setpoints, download diagnostics and restart services. A historian should normally consume defined telemetry, not act as an engineering console. If the proposed protocol provides broader functions than the business needs, consider a controlled gateway or broker that exposes a restricted application interface. Do not claim that a software switch labelled read-only is a safety control without validation of the resulting command path.

Produce the map from configuration and observation

Obtain approved architecture drawings, switch and firewall configuration, vendor manuals, asset ownership records and an engineering-led walkthrough. Inspect passive telemetry where available and use device management screens under change control. Avoid broad unauthorised scanning of the plant network. Map direct and indirect paths; a vendor’s jump host, cloud gateway and remote-support agent may form a management chain that is absent from a simple physical topology drawing.

Confirm where credentials originate and how they are rotated. Where a legacy controller only understands local passwords, show the compensating boundary: a restricted engineering workstation, approved remote-access gateway and session supervision. Document the fallback if the vendor dashboard or internet link fails, including whether the plant operates autonomously or needs an operator to switch modes. A cybersecurity control that prevents emergency pumping can itself become a safety risk.

Review a proposed connection change safely

Use a simulation, spare controller or engineering-approved test system to compare the intended telemetry-only function with prohibited management functions. First confirm that the monitoring data reaches the correct analytics destination and retains timestamps and units. Then verify that the supplier identity cannot send setpoint changes, issue controller downloads, reach other station segments or use the tunnel to access operator workstations. Test denials at the actual protocol boundary rather than relying exclusively on a cloud dashboard permission screen.

Prepare an isolation procedure before the exercise: who can stop the remote connector, whether local control remains available, and how engineers will prove no process configuration has changed. Where no representative laboratory exists, document a design review and passive verification instead of fabricating an intrusive live test. The scope of evidence should match what was safe and actually observed.

Assess availability, integrity and alarm handling

Telemetry can be security-sensitive even without control commands. A false tank-level display may mislead the supplier or create unsafe maintenance decisions. Review timestamp integrity, sensor identity, data signing where supported, loss-of-link alarms, buffering and replay behaviour. Confirm that a remote dashboard cannot suppress alerts needed at the site. Review supplier access to historical production patterns and whether external data retention matches the utility’s requirements.

Test failure of the broker and return of connectivity under controlled conditions. Does buffered telemetry arrive in order, with a distinguishable original timestamp? Can the supplier mistakenly interpret stale data as current? Is there an independent local indication for critical alarms? Engineering acceptance must include those operational outcomes, not solely whether the firewall observed an outbound session.

Illustrative pump-station trust-boundary worksheet

Consider a station with two duty pumps, one standby pump, a PLC, local HMI, engineering workstation, historian interface and cellular telemetry gateway. The utility wants a vendor cloud dashboard to display runtime hours and faults. The initial proposal routes all PLC protocol traffic through a remote VPN so the supplier can “read the same information as local engineers”. The connection map should make the hidden consequence visible: the supplier tunnel may reach a controller interface that also supports configuration changes. The issue is not the dashboard’s appearance but the route and identity that carry its requests.

A more constrained design may have the historian publish selected telemetry to a broker, with the external service receiving only agreed fields. Engineering still needs to determine whether the broker can request data or commands in the reverse direction. Record these details in a table with source zone, destination zone, protocol direction, permissible function codes or API methods, account, change authority and safety consequence. Mark any flow that cannot be characterised as unverified rather than treating it as inherently read-only.

Four safe validation cases

  • Normal telemetry: publish a synthetic pressure reading with a known unit and timestamp. The cloud service should display the value without opening an engineering session. Evidence includes source record, broker receipt and dashboard rendering time.
  • Unauthorised control: from the representative vendor role, attempt a non-operational test-system action corresponding to a forbidden setpoint write. The boundary must refuse it, and the reviewer must identify which control performed the refusal.
  • Stale communications: interrupt the laboratory broker link while keeping the simulated plant controller operating. The display must indicate stale values or loss of telemetry rather than showing old measurements as live.
  • Vendor departure: revoke a fictional engineer’s access and attempt a new broker or gateway session. Any remaining unattended service path should be found and accounted for.

The test owner should explicitly record which cases could not safely be run against live equipment. Those remain assurance gaps for engineering assessment or lab replication; they must not be marked passed by inference.

Operational safety constraints

No remote cyber exercise should alter live pump sequencing, protective interlocks or emergency stop logic to demonstrate a security control. Where plant design requires fail-safe behaviour, the engineering authority defines it and approves any related test. Review which local alarms and manual controls remain active if the telemetry gateway fails. A contractor access policy that inadvertently prevents urgent onsite maintenance can itself be unacceptable; design an authorised emergency route with compensating observation and automatic expiry.

The utility should inspect whether data sampling, timezone conversions and sensor identities survive the analytics integration. An apparently secure feed carrying misleading information can still damage operations. If the dashboard suggests maintenance actions, require operators to distinguish advisory recommendations from approved engineering commands. The supplier should not gain an automatic write path when the product later adds optimisation features.

Evidence for an architectural change decision

The final decision pack includes the as-built connection drawing, exact routes, controller and broker function descriptions, authorised identities, simulated denial evidence, local-operation contingency and vendor maintenance terms. Have both an OT engineer and security reviewer sign the relevant sections. A remaining broad tunnel should carry a risk owner, isolation measures and funded replacement or redesign plan. Revisit the map after software updates, station expansions or remote-support changes, because the accepted communication path can drift without a new physical cable being installed.

Rehearse supplier cancellation without loss of local control

The utility should be able to stop paying for the remote dashboard and still operate the station safely. Simulate expiration of the vendor’s cloud account while the controller and local HMI remain in their normal test state. Verify that alarms critical to local operations do not rely on the SaaS notification path alone. Record whether historical telemetry remains available to the utility and how any integration keys are withdrawn. A cloud supplier should not become the only custodian of process logs needed for engineering investigation.

Ask the engineering lead to review how the station responds to a broken analytics link, an incorrectly timestamped data packet and an unauthorised remote login. These are different failure modes: availability, integrity and access. The connection map should show which controls prevent each one, rather than treating a single outbound firewall rule as comprehensive assurance.

Evaluate the supplier’s ability to alter behaviour

The contract may describe telemetry analytics today but allow future remote optimisation features. Ask the vendor to identify product functions that can send commands, acknowledge alarms or initiate remote troubleshooting. Compare those capabilities with the utility’s present network and account permissions, not just with which dashboard buttons have been enabled. A later firmware update may change default protocol functions or open a support service. Require change review whenever the vendor’s effective route expands. The plant owner should retain authority over control-mode transitions and receive independent notification of changes to the remote communication configuration.

The operator should also document the condition under which remote analytics must be isolated immediately, such as an unauthorised engineering-command request or a supplier credential suspected of compromise. This decision needs a plant-safe shutdown sequence and a clear record of which local monitoring channels remain effective. A network rule that can be switched off quickly is useful only if the consequence for station alarms and remote callouts is already understood.

Evidence and authority to sign off

Retain the approved connection drawing, exact firewall and gateway rules, vendor protocol capability, device inventory, authorised identities, test plan, passive traces and change approvals. Assign one owner to the plant’s safety impact and another to cybersecurity enforcement. Supplier contracts should describe permitted remote functions, maintenance windows, incident reporting, log access and deletion of diagnostic exports. Avoid granting an indefinite “support any device” permission to solve an occasional telemetry problem.

The connection is acceptable when the utility can explain every reachable route, distinguish monitoring from control authority, show that prohibited functions are blocked at appropriate boundaries and demonstrate that the station remains safe during loss of the supplier service. Revalidate after firmware updates, new analytics features or changes in remote-access tooling. The map should stay alive as an operational record, not become a drawing accepted once and forgotten.

Sources and further reading

How Next Defence can help

Validate the pumping-station OT connection map through an OT, IoT and critical infrastructure security assessment. Operations should approve passive discovery and demonstrate where supplier connectivity is blocked without disrupting water service.

LET'S TALK

Let’s talk about your security.

Tell us what you are protecting, where you need greater visibility or what you want to achieve. We will help identify the right next step.

Talk to a Security Specialist

Describe your security requirements. Please do not submit passwords, credentials or confidential incident evidence. This form is not an emergency incident-response channel.

Form powered by HubSpot. Review our Privacy Policy. If the form doesn’t load, email [email protected].