Mining sites rely on specialist contractors to maintain engineering tools, survey systems, production-planning applications and equipment interfaces. A laptop that is acceptable for a supplier’s own office may not meet the mine’s security requirements. The challenge is deciding when to admit the device, when to restrict it, and how to keep legitimate maintenance possible without treating every contractor endpoint as part of the trusted site network.
This quarantine plan addresses a hypothetical mining environment where contractor laptops require time-limited access to planning or maintenance services. It assumes formal site approval and safe test identities. It does not authorise scanning industrial controllers, changing live production networks or disconnecting safety-critical equipment during an experiment.
Decide what quarantine means for each service
Define the access that the device would normally receive: a web-based engineering portal, a remote-desktop jump host, a vendor management appliance or a file transfer area. Some devices never need direct network connectivity to plant equipment. Separate data exchange from remote control, and explicitly forbid a path to operational technology unless the work order and site owner require it.
Agree a small set of device states: not registered, awaiting assessment, approved for a narrow task, restricted pending remediation and fully revoked. Each state should correspond to a technical enforcement policy. A label in a ticketing system cannot be the only boundary if a device is still able to connect to the same subnet after a restriction decision.
Identify who can approve access, who evaluates the endpoint and who can interrupt the connection when a serious issue appears. Security staff should not independently decide to halt critical plant work without a predefined operations escalation route. Conversely, a maintenance supervisor should not be able to waive a mandatory security control without traceable risk acceptance.
Define an achievable admission standard
Select controls relevant to the actual route: supported operating system, endpoint-protection health, storage encryption, screen lock, host firewall, recent security updates and absence of high-risk detections. Where the mining company manages the device, richer posture data may be available. For supplier-owned devices, a limited attestation and restricted virtual-access model may be more realistic than invasive remote inspection.
A screenshot of an antivirus dashboard is not necessarily trustworthy evidence. Prefer a device-health signal from an approved management platform or a verified endpoint assessment. If the site cannot validate the supplier’s posture, use a jump host or managed access appliance with no broad lateral access. Contractual assurances are useful context but should not replace enforcement at the network boundary.
Keep the admission decision attached to a specific person, device identifier, supplier and work order. A site visit ending on Friday should not turn into permanent access because the device remains registered. Establish expiry and reapproval rules for high-impact maintenance activities.
Construct a safe quarantine test
Provision a synthetic contractor identity and a designated test laptop or virtual endpoint. Record the approved target, permitted network flow, expected authentication and the configuration version of the admission policy. Use a non-production replica of the target application where possible, and require operations sign-off before any production-adjacent connection.
First demonstrate the normal authorised path. The test device meets the policy, the contractor signs in through the required multifactor method and reaches only the intended planning service. Confirm the outcome from gateway logs and the target service rather than accepting an access-portal success page as sufficient proof.
Next simulate one non-compliant condition such as missing endpoint-management enrolment or a deliberately expired attestation. The test account should move to a restricted state. Confirm that existing sessions, cached routes and file shares behave according to the documented quarantine design. If an active session remains usable until expiry, record the window and determine whether the risk warrants session revocation.
Attempt a harmless connection to an out-of-scope test destination in another network segment. The expected result is a logged denial. Do not probe production controllers or neighbouring sites to demonstrate segmentation. The assessor can verify intended policy rules and a designated safe test endpoint without creating operational load.
Give contractors a controlled remediation route
Quarantine must not be a dead end. Provide the technician with a non-sensitive notification describing the unmet requirement, a service contact and an approved remediation action. For example, the supplier may need to update its managed device or switch to a mine-managed temporary workstation. Avoid instructing a worker to disable endpoint protection to satisfy an ambiguous connectivity error.
If the endpoint is suspected of malware infection, route it to the supplier’s incident and device-management teams. The mine may suspend access and preserve relevant gateway logs without taking custody of a third-party laptop or running unapproved forensic tools. Define responsibilities and notification requirements in the vendor access agreement.
For urgent maintenance, create a preapproved alternative: a clean site-owned jump workstation, supervised session, narrow protocol allowlist or delayed maintenance window. The exception needs a business owner, operational justification, expiry and independent logging. Do not grant a blanket VPN bypass because the device cannot pass its posture check.
Validate isolation and recovery
Once the synthetic endpoint is returned to a compliant state, have the sponsor explicitly authorise a new session. Confirm that access returns only to the original narrow target. A device should not inherit an old privileged route because the ticket was reopened or the contractor was previously approved for a different site.
Check the logs for the complete sequence: initial acceptance, reason for restriction, enforcement decision, attempts during quarantine, remediation approval and restored access. Make sure the system can link the events to an individual and device without distributing unnecessary personal telemetry.
A hard failure includes a device marked quarantined that still reaches the protected service, an approval that cannot be attributed to a named owner, or a restricted session that can create an unmonitored tunnel to another site. An inconclusive result means the evidence is insufficient, not that the endpoint passed.
Build a deployable operating procedure
The finished runbook should state which assets are in scope, who receives an alert, when operations must be consulted, how access is withdrawn, and how a contractor regains limited access. Attach the approved policy matrix and evidence references, plus an after-hours contact for maintenance that cannot wait for an office-day review.
Pilot the procedure with two suppliers whose devices and work patterns differ. Track rejected admissions, time to provide a safe alternative, unexplained exceptions and repeat policy failures. Review after a security-tool change, network segmentation update or new supplier onboarding.
Worked example: a visiting engineer fails a posture check
A fictional engineer arrives at a remote mine to inspect an equipment-monitoring application. The supplier laptop has a supported operating system and a valid user account, but its endpoint health service has not checked in for several days. The engineer has a legitimate work order and a narrow task, yet the policy marks the endpoint unverified. The correct action is neither unconditional trust nor automatic cancellation of essential maintenance.
First confirm the approved task and intended destination with the maintenance supervisor. Determine whether the site’s posture system is reporting a genuine problem or a telemetry outage. Ask the supplier’s endpoint administrator to review the device through its normal management channel; the mine’s help desk should not request access to unrelated supplier files or demand local administrator credentials.
Provide an authorised alternative route using a site-managed jump workstation if the task cannot be postponed. The engineer authenticates individually, the session is limited to the designated monitoring application and an independent event record captures the approval. Direct connections from the unverified laptop to plant networks remain denied. If the alternative cannot be implemented safely, delay the work under the operational escalation plan.
During the exercise, an assessor tries to reach a harmless test host on another segment from the quarantined endpoint. The gateway must show the denied route. A second test uses the approved jump host and confirms that permitted maintenance traffic reaches only the intended target. These two observations are stronger than a quarantine dashboard displaying a red status with no enforcement evidence.
The post-exercise review asks why a supplier endpoint could become stale without advance warning. The contract may require a pre-arrival posture check, while the site may need a documented exception procedure for remote connectivity failures. Track the elapsed time to a safe replacement path and whether the risk decision was made by the right business owner.
Finally remove the temporary access, close the session and check that the laptop cannot silently regain direct network admission after its endpoint tool reports healthy again. New access should still require an active work order and sponsor approval. This protects the site from the opposite failure: a previously quarantined device retaining a standing privilege after the legitimate maintenance period ends.
What to verify with contractors before arrival
Send the access standard to suppliers before the maintenance visit, including supported device methods, required security posture, allowed protocols and whether a managed jump workstation is available. Ask for a technical contact who can repair an endpoint in the supplier’s own environment. The mine should not discover at the gate that the only contractor laptop cannot participate in the approved access process.
Check that the work order lists the correct site and task duration, and that the supervisor knows how to request an extension. A contractor servicing a conveyor inspection portal should not receive broad access to the site engineering VLAN merely because both systems belong to the same supplier. For a recurring visit, compare the last approved access with the current need rather than cloning the old permissions.
If the supplier cannot satisfy a posture requirement, record the reason, risk owner and safe alternative. A temporary jump session may be acceptable for reading diagnostic information but not for installing unapproved software. Make that distinction explicit in the authorisation so neither security nor operations assumes the other approved a wider action.
The objective is not to exclude contractors from necessary work. It is to prevent an unmanaged or unhealthy device from becoming a trusted bridge into a mine’s systems, while giving supervisors a safe and observable path for essential maintenance.
Sources and further reading
How Next Defence can help
To assess the relevant controls within an approved scope, explore Managed Security Protection. This practical guide is general information rather than a substitute for a scoped assessment.