A water utility vendor route spans pump diagnostics and treatment controls. This article sets out a controlled test design for the specified assets and roles; no real-world compromise is asserted.
Plan from process safety and the physical asset
Begin with the control-room description of what the pump does, not the vendor's VPN configuration. Name the pump station, its diagnostic sensors, alarms, local controllers and the treatment assets the supplier must not reach. An approved vibration reading should still be available during the agreed maintenance window even if a separate write function is rejected. Engineering should identify whether the remote path uses an intermediary historian, an industrial gateway or direct controller traffic; those arrangements have different consequences for safety. Capture expected alarm behaviour if the communication link fails, and do not use the live treatment process to explore unknown protocol side effects.
The vendor account is only one part of this boundary. A shared gateway may accept the contractor's MFA login and then relay commands into a different trust zone without checking the device target. Map every hop from the identity provider through remote desktop, jump host and protocol bridge to the final PLC. Record the particular operations allowed across each hop, rather than using a broad network address range as the statement of permission. Have plant engineering confirm which diagnostics can be viewed using a laboratory simulator and which messages could change a setpoint, acknowledge an alarm or affect control logic.
Source-specific observations to retain
Availability and safe operation are inseparable. Utilities connect operational technology, corporate identity, contractors and emergency procedures. A broad firewall cut may remove essential alarms, while a supplier tunnel may span more than one plant. Establish physical and process safety requirements first, then prove narrow access and a safe manual fallback with an engineering witness. For this exact workflow, the operating outcome is: Protect plant continuity and allow necessary diagnostics without unsafe remote control. The final decision belongs to water operations control-room lead and OT access owner.
Two concrete operations define the boundary. First, a verified contractor reads simulated pump vibration status only during the approved service window. Second, the same account issues an unauthorised setpoint change or connects to another site's PLC through a shared gateway. Map the vendor identity to the jump-host record, approved protocols, maintenance window, OT zone and safety-stop conditions. With engineering supervision, verify the legitimate diagnostic path and a denied cross-site or write-function request in a safe test setting. Bind each remote grant to its site, time and protocol, and retain the session and revocation evidence.
Build an engineering-safe validation exercise
Prepare a fictional pump-vibration tag as the positive case. The contractor connects during a scheduled session, reads the value and ends the connection; the jump-host log must link the named worker to the permitted tag. For the negative case, attempt a simulated setpoint write and a simulated connection to a separate site's PLC. The gateway should reject both before the controller sees a state-changing command. Do not send an experimental write to live plant equipment. If the gateway can only enforce destination but not industrial function, retain that constraint as residual risk and require compensating supervised access.
A legacy instrument may only support a local shared account. That does not justify a permanent shared vendor VPN. Put a recorded, site-specific approval boundary in front of the instrument, limit the service window and require a maintenance work order with two named contacts. Define an emergency suspension route that operations can invoke without waiting for the contractor's service desk. Test that route against the simulator while confirming that alarms, local observation and essential manual operations remain intact. Remove temporary permissions promptly and compare the session transcript with the approved work order.
Record evidence and safe operating decisions
The final packet should include industrial zone drawings, permitted protocols, jump-host recording, maintenance approvals, test timestamps and the plant witness's decision. Separate a successful contractor login from a permitted telemetry read, and separate denial of simulated control writes from proof that every production path is protected. Identify untested devices, historical shared credentials and any alternate modem or supplier tunnel. If engineering cannot demonstrate a safe negative test, record 'not tested' rather than accepting a paper design. Retest at the next gateway upgrade, vendor contract change or site commissioning milestone.
Protocol-level controls and exceptional maintenance
A vendor session may carry several kinds of industrial traffic through the same tunnel. A gateway rule that names a single plant subnet can still allow reading and changing process values if it does not distinguish protocol functions. Obtain the supplier's diagnostic protocol specification and identify the actual message classes required for pump vibration inspection. Compare the intended function with observed traffic in an isolated test rig. Where the product cannot restrict function codes, place a separate monitored application proxy or engineering approval process ahead of the sensitive route. Do not assume a read-only desktop view means the underlying account has no write permission. Document which safety-critical functions remain reachable and make the compensating review visible to the plant owner.
Maintenance exceptions should be anchored to specific assets and dates. For example, an engineer may approve a two-hour vibration investigation at pump station A, but that authorisation must not silently remain valid for treatment controllers at station B. Require the contractor to identify its actual technician and the task number before a privileged session begins. If the operator must use a shared account on an old device, link the account use to the jump-host identity and session recording. After the window, verify the temporary role is revoked and the route has returned to its baseline. The check is incomplete until the normal supervisory alarms and local operations have also been observed.
Control-room decisions when access fails
A remote maintenance disconnection must not deprive the control room of critical telemetry or the ability to act locally. Design a fail-safe behaviour with engineering: when the vendor tunnel is lost, pump operations continue under local control, monitoring alarms remain visible through their established path, and any scheduled diagnostic work stops without changing a controller state. Simulate this using a lab or network model before changing a production rule. If the contractor is already investigating a fault that could affect water treatment, the control-room lead may postpone a security cutover until there is an approved safe alternative. The decision, its expiry and the compensating watch are part of the evidence, not a reason to bypass approval altogether.
At handover, have a different engineer review the zone diagram and replay the permitted and prohibited paths from the recorded session references. Ask whether a privileged vendor identity can be used from an unapproved workstation, whether the gateway depends on a single external identity provider, and whether an emergency suspension instruction actually reaches the enforcement device. State what remains untested, including legacy instruments that could not be safely exercised. The final workbook is useful when it supports a concrete operating decision: continue approved diagnostics with monitored restrictions, schedule a gateway change, or suspend remote support pending a safe engineering plan.
Test cases and proof required
| Case | Scenario | Acceptance evidence |
|---|---|---|
| Valid operation | An approved contractor reads simulated vibration telemetry in its window | A named reviewer confirms the expected final result in the receiving system. |
| Boundary challenge | The account issues a setpoint command or reaches another site PLC | The test environment refuses the out-of-scope operation at an enforcement point. |
| Evidence correlation | OT zone map, allowed protocols, jump-host recording and work authorisation | Approval, execution and final state can be linked through stable event references. |
| Scoped change | Bind access to plant, protocol, operator and expiry without interrupting alarms | Only the intended privilege or route changes; unrelated work continues. |
| Revoked authority | Repeat the negative check after the authorised session or work order expires. | Old access is ineffective and no background operation silently revives it. |
| Service continuity | Rerun the authorised activity and compare the resulting business or plant record. | A safe business outcome survives the security change. |
Unresolved scope and independent sign-off
The water operations control-room lead should sign the engineering worksheet only after receiving the approved pump telemetry result and evidence that a second-site connection was refused in the simulation. The OT access owner must also identify which legacy shared accounts remain and whether the gateway can distinguish diagnostic functions from setpoint writes. If it cannot, record the precise residual exposure and arrange supervised maintenance rather than declaring a misleading read-only outcome. Evidence should point to the physical asset and protocol, not only the VPN username and login time.
A subsequent vendor contract or controller replacement is a reason to repeat the session exercise. Confirm the control room can suspend remote access without losing the normal alarm path. The recorded exception should expire at the end of the work order, and engineering should compare the permitted protocols with traffic seen during the authorised window. Where a laboratory cannot reproduce a fragile device's behaviour, keep that caveat in the handover. The test demonstrates a bounded access design; it is not proof that every older field device has been safely exercised.
Include a gateway-configuration drift review in the workbook. Compare the approved route and protocol list with the active device configuration, not only the network change request. A supplier may ask for a broad temporary subnet route to troubleshoot one pump; identify whether an engineering witness can instead permit a single diagnostic host and one protocol. Keep the rule expiration visible to the control room so it is not left indefinitely enabled at shift change. Where a remote path relies on an unmanaged cellular modem, register it as a separate exposure requiring an owner rather than assuming that the main VPN rule controls every entry point.
The negative tests should examine three different failure classes: wrong destination, wrong protocol function and wrong time. An allowed contractor reading the correct tag outside its approved window is a distinct defect from a contractor trying to write to a treatment controller during the window. Record each response separately. If the gateway denies traffic but an engineer cannot confirm where the denial occurred, repeat the test at the relevant enforcement device in a safe lab. The exercise's conclusion must identify exactly which class of access has been demonstrated as controlled.
Give the engineering witness a protocol-function matrix
Write the acceptance matrix before initiating the session. For a simulated historian or engineering workstation, identify the permitted source, destination, maintenance window and protocol operation, and then define distinct denials for a control-write function, an unrelated site’s address and an expired grant. Where the protocol cannot separate read from write functions reliably, document that limitation and keep any active-system test under engineering supervision.
Capture the gateway decision and the receiving equipment’s observation for each safe test. A rejected packet at the network boundary is useful, but it does not prove that a cached account, second modem or vendor fallback route is also blocked. Ask the site owner to decide which residual paths require removal and which require a formally time-bound exception. The exercise must stop if a live control response is unexpected or if operations cannot confirm safe state.
Sources and further reading
- NIST SP 800-207 — Zero Trust Architecture
- ASD Cyber Threat Report 2022–23
- NIST SP 800-61 Rev 2 — Computer Security Incident Handling Guide
Explore Next Defence expertise
Explore how Next Defence can help address the risks behind utility vendor remote access: a protocol and session validation workbook. Our specialists can review the relevant controls and source evidence, demonstrate whether the unsafe operation is prevented, and help deliver the following outcome: Protect plant continuity and allow necessary diagnostics without unsafe remote control. We work with the appropriate service owner and technical teams to keep authorised operations available.