Make control-room alarms an exercise constraint
Set the scenario during a fictional substation maintenance shift. A remote supplier connection is suspected, but the operator’s alarm summary and historian feed remain necessary for safe operation. Ask the control-room lead to identify exactly which management route can be isolated without preventing protective alarms, status indications or authorised local control. The cybersecurity lead should provide network observations but must not order a disruptive shutdown without engineering approval. Prepare a test copy of the relevant firewall rules and a simulated telemetry stream rather than experimenting on an operating installation. In the first run, preserve ordinary alarm acknowledgements while denying the suspect supplier session. In the second, simulate loss of the primary remote engineering route and show how a verified local technician can complete a planned diagnostic. Note where a change would require formal electrical safety or change-control authorisation.
The relevant trust boundary
Two concrete operations define the boundary. First, an operator monitors simulated switchgear alarms and undertakes approved local control during corporate network isolation. Second, an overly broad firewall rule cuts the only functioning alarm transport or leaves a contractor remote-write route active. The assessor should use this actual evidence set: Map telemetry protocols, fallback radio coordination, switching approvals, zone diagrams, gateway logs and manual procedures. to identify the receiving system and distinguish the permitted transaction from the prohibited one. The proposed correction is: Define plant-safe isolation and supervised restoration, including an explicit no-write supplier boundary.
Design the permission and safe alternative
The tangible business objective is: Protect safe switching, alarm receipt and a rehearsed manual fallback during isolation. A restriction would have to preserve the approved action: An operator monitors simulated switchgear alarms and undertakes approved local control during corporate network isolation. The proposed improvement is: Define plant-safe isolation and supervised restoration, including an explicit no-write supplier boundary.
An appropriately scoped exception might be required because actual grid operation and safety authority cannot be replicated by general office IT tests. It should be tied to the current approved activity: An operator monitors simulated switchgear alarms and undertakes approved local control during corporate network isolation. The exception must not permit: An overly broad firewall rule cuts the only functioning alarm transport or leaves a contractor remote-write route active.
Set the validation method
Build a positive case from this authorised operation: An operator monitors simulated switchgear alarms and undertakes approved local control during corporate network isolation. Construct a negative case using: An overly broad firewall rule cuts the only functioning alarm transport or leaves a contractor remote-write route active. Relevant observations: Map telemetry protocols, fallback radio coordination, switching approvals, zone diagrams, gateway logs and manual procedures. Final condition: Protect safe switching, alarm receipt and a rehearsed manual fallback during isolation.
Recovery acceptance and accountable handover
Final responsibility sits with control-room supervisor and OT safety engineer. Retain the evidence set: Map telemetry protocols, fallback radio coordination, switching approvals, zone diagrams, gateway logs and manual procedures. The improvement is: Define plant-safe isolation and supervised restoration, including an explicit no-write supplier boundary. Retest the unsafe path: An overly broad firewall rule cuts the only functioning alarm transport or leaves a contractor remote-write route active.
After implementation, rerun this practical test: In a lab isolate corporate access, retain alarm acknowledgements, and prove no unscheduled vendor write can reach a controller. Confirm the final business result: Protect safe switching, alarm receipt and a rehearsed manual fallback during isolation. Deny this operation after the change: An overly broad firewall rule cuts the only functioning alarm transport or leaves a contractor remote-write route active.
Assessment worksheet
Mark checks as passed, failed or untested.
- Service sponsor: Control-room supervisor and OT safety engineer
- Current situation: A utility must isolate a suspicious corporate endpoint from an energy control environment without losing safety alarms.
- Permitted result: An operator monitors simulated switchgear alarms and undertakes approved local control during corporate network isolation.
- Unsafe result: An overly broad firewall rule cuts the only functioning alarm transport or leaves a contractor remote-write route active.
- Evidence sources: Map telemetry protocols, fallback radio coordination, switching approvals, zone diagrams, gateway logs and manual procedures.
- Qualifying exception: Actual grid operation and safety authority cannot be replicated by general office IT tests.
- Controlled improvement: Define plant-safe isolation and supervised restoration, including an explicit no-write supplier boundary.
- Positive and negative test: In a lab isolate corporate access, retain alarm acknowledgements, and prove no unscheduled vendor write can reach a controller.
- Exit and retest: Protect safe switching, alarm receipt and a rehearsed manual fallback during isolation.
When the primary contact is unavailable
Accountable authority: Control-room supervisor and OT safety engineer. The original control assumption needs testing: A topology map indicates two redundant paths even though both traverse the same identity service. A reliable review should include technical evidence from map telemetry protocols, fallback radio coordination, switching approvals, zone diagrams, gateway logs and manual procedures. and an acceptance decision that the legitimate action still functions: An operator monitors simulated switchgear alarms and undertakes approved local control during corporate network isolation. The requested security improvement is: Define plant-safe isolation and supervised restoration, including an explicit no-write supplier boundary.
For independent assurance, demonstrate the precise experiment: In a lab isolate corporate access, retain alarm acknowledgements, and prove no unscheduled vendor write can reach a controller. The analyst should correlate the result with map telemetry protocols, fallback radio coordination, switching approvals, zone diagrams, gateway logs and manual procedures. A successful test must preserve an operator monitors simulated switchgear alarms and undertakes approved local control during corporate network isolation. without accepting an overly broad firewall rule cuts the only functioning alarm transport or leaves a contractor remote-write route active.
Different protocol paths require different evidence
Give the technical team a route map covering remote desktop into a jump host, engineering protocol sessions to a test controller and outbound telemetry to monitoring systems. An allow rule for a support jump host should not imply permission to issue process writes. Inspect protocol-specific access, account scope, source network, approved work order and session recording; an authenticated VPN event alone cannot show what happened at the engineering endpoint. Include a hypothetical vendor laptop connected to a field network during commissioning and require a separate decision about that direct path. Passive traffic capture, configuration exports and a lab device can support the exercise without active scanning of production controllers. When the team sees a network flow but lacks application-level events, label the operation uncertain rather than assuming an engineering command completed.
Use staged isolation and named stop conditions
The facilitator presents an unrecognised remote session followed by a failed attempt to change a simulated setting. The security team proposes blocking every vendor route; engineering warns that a critical maintenance alarm would then lose its communications channel. Require a narrower change to the suspect identity, jump session or explicit destination, with preapproved rollback and monitoring of the alarm feed. A stop condition should be concrete: missing alarms, delayed control-room indication, loss of required maintenance visibility or any unplanned operational effect. If that condition occurs, the team reverses the test change under engineering supervision and records why. Include a case where the vendor’s identity provider is unreachable, so on-site staff must rely on a separately approved local procedure. General claims of ’24/7 access’ are not adequate fallback instructions.
Return to normal only after observed alarm continuity
At closeout, ask the control-room lead to inspect a timeline of expected alarms and test acknowledgements across the simulated restriction. The cybersecurity assessor verifies that the suspect session cannot reconnect to the protected engineering target, while an approved technician demonstrates narrow access to the lab controller. Preserve changes to routing, firewall rules, jump-host roles and any temporary maintenance account. The record should identify unresolved evidence about historical operations separately from the current isolation state. Have the incoming shift confirm the controlled fallback and retest trigger without consulting the original team. Following a supplier software update or network redesign, repeat both the alarm-preservation test and the prohibited-write test. A successful exercise is one in which safety-critical observations continue and unauthorised engineering control does not.
Alarm timing is part of the acceptance boundary
When testing control-room isolation, configure the simulated alarm stream with identifiable normal, delayed and missing events. The operations assessor needs to see whether acknowledgements and timestamps remain meaningful after the network change. A dashboard showing ‘connected’ can hide a telemetry path that delivers updates too slowly for the intended operation. Agree on test criteria with the engineering owner rather than inventing a latency threshold for real grid equipment. Record the observed result and whether the control-room team can distinguish an instrument failure from a security restriction. If the lab simulation cannot reproduce the site’s protective systems, explicitly state that limitation and restrict conclusions to the routes actually tested. The exercise should not substitute for the site’s formal safety assurance process.
Plan for two suppliers who share one jump host
A contractor support gateway may be used by both equipment maintenance and monitoring vendors. A broad emergency block might remove both suppliers even when only one identity is suspect. Give participants a role map that identifies each approved destination and the maintenance tickets associated with it. Ask whether the gateway can terminate one account or session while preserving the required read-only monitoring path. If not, engineering should identify a separate local observation route and document the controlled service impact. After the restriction, test the prohibited maintenance write and the permitted monitoring task independently. Retain the gateway configuration and a change approval that another operator can interpret during the following shift. The design goal is precise operating control, not merely fewer network connections.
Record the physical fallback separately from cyber controls
If an approved remote engineering path becomes unavailable, local plant procedures may preserve observation and control without using an emergency network bypass. The engineering team should identify which on-site roles are trained for this mode, which records they keep and when remote access can safely return. Do not infer that a cyber technician can perform these operations because they can administer the gateway. In the tabletop, ask participants to name an operating stop condition and the person authorised to invoke the fallback. This gives the security team an explicit safe boundary for its restriction decision.
Sources and further reading
- NIST SP 800-207 — Zero Trust Architecture
- ASD Cyber Threat Report 2022–23
- NIST SP 800-61 Rev 2 — Computer Security Incident Handling Guide
Explore Next Defence expertise
Explore how Next Defence can help address the risks behind electricity control-room isolation drill with alarm preservation. Our specialists can review the relevant controls and source evidence, demonstrate whether the unsafe operation is prevented, and help deliver the following outcome: Protect safe switching, alarm receipt and a rehearsed manual fallback during isolation. We work with the appropriate service owner and technical teams to keep authorised operations available.